This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: July 22, 2025
The Western Green Energy Hub is a proposal to design, construct and operate a large-scale wind and solar power project to produce value added products, with the base case assuming green ammonia production. The proposal is situated on WA Mirning Native Title determined land in the far southeast of Western Australia in the Shire of Dundas and City of Kalgoorlie-Boulder, to the northwest of Eucla in the South Coast Region. The proposal will be located on Unallocated Crown Land and pastoral leases... Read more...Last updated: January 24, 2025
The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...Last updated: July 22, 2013
The proposal is to construct and operate a tidal power station across the mouth of Doctor’s Creek, near Derby, for the generation of electricity. The proposal also includes the construction of power lines to distribute power to major centres in the West Kimberley., Note:, This assessment is of a modification to the Derby Tidal Power proposal (previously reported in Bulletin 942 and Bulletin 984). Read more...Last updated: January 6, 1994
The proposal is to establish an energy infrastructure in the Pilbara region of Western Australia. This proposal will provide natural gas and electric power for future industrial developments and includes: a 215 kilometre buried gas pipeline from Karratha to Port Hedland; a gas turbine power station at Port Hedland; approximately 400 kilometres of high-voltage power transmission line from Port Hedland to Newman; a back-up generating plant at Newman; and closure of the existing diesel powered... Read more...