This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 27, 2025
The proposal is for the development of an onshore wind farm and involves the construction and operation of up to 20 wind turbines, generating up to 100 MW. Associated infrastructure includes meteorological masts and communication towers, operation and maintenance building, substation and transmission infrastructure and other supporting infrastructure. The proposal is located approximately 15 km northeast of the town of Augusta, in the South West region of Western Australia. The wind farm... Read more...Last updated: October 13, 2025
The Public Transport Authority of Western Australia (PTA) proposes to expand the Swan River Ferry Network by constructing new ferry infrastructure and services at Matilda Bay and Applecross, and upgrades to existing infrastructure at Elizabeth Quay. In addition to a new jetty and terminal, construction of the Matilda Bay facility will also include onshore electric charging infrastructure for the ferries, and modification of the existing road layout to accommodate a new bus embayment and... Read more...Last updated: October 9, 2025
The proposal is to construct and operate a new multi-use entertainment and sporting precinct at Burswood Park. The precinct will include: a new outdoor amphitheatre for live music and other events; a multi-use track for motor racing (including a one 3-day Supercars event per year), cycling and community sport; a multi-use event building, incorporating function facilities, meeting rooms and event spaces; and enhanced transport and connectivity links with Optus Stadium and the wider Burswood Park... Read more...Last updated: September 24, 2025
Proposal by Woodside Energy Ltd to develop infrastructure to transport, inject and permanently sequester up to 14,200 tonnes of carbon dioxide (CO 2 ) per day into the Calliance Storage Formation at an expected annual average injection rate of 3-4 million tonnes per annum. Calliance is an underground, rock formation located offshore, 4 km below the seabed and about 425 km north of Broome. The CO 2 would originate from the proposed Browse to North West Shelf Project which proposes to produce... Read more...Last updated: April 9, 2025
The Robe Mesa Iron Ore Project is a greenfield operation located within the Robe Valley Channel Iron Deposits, adjoining Rio Tinto’s Mesa F deposit, in the West Pilbara of Western Australia, within the Shire of Ashburton, approximately 180 kilometres from the town of Onslow. The proposal involves above water table open pit mining with a total disturbance of 270 hectares of native vegetation within a 903 hectare development envelope. The proposal includes a dry crush and screen processing plant... Read more...Last updated: February 12, 2025
Cougar Sand Supplies propose to extend their existing sand and limestone quarry over a period of 10 – 15 years. The quarry is located approximately 7.7 kilometres northeast of the Preston Beach townsite in the Shire of Waroona. The proposal is adjacent to the Myalup State Forest and is within an exclusion area under, State Planning Policy 2.4 - Planning for Basic Raw Materials, . Infrastructure from the existing quarry including a bore, access roads and a mobile crushing and screening plant... Read more...