This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 22, 2014
The proposal is for the construction and operation of an ocean outlet and associated infrastructure, for the Bunbury wastewater treatment plant. The outlet extends approximately 1.7 kilometres from the shoreline adjacent to the plant, for the disposal of treated wastewater Read more...Last updated: June 30, 2010
The proposal is to construct and operate a minimum 50 GL/annum and up to 100 GL/annum desalination plant on Lots 32 and 33, and Part Lot 8 Taranto Road, Binningup; marine inlet/outlet pipes; and a water supply pipeline to transport potable water to the Integrated Water Supply Scheme via a storage facility near Harvey. Read more...Last updated: December 15, 1999
The proposal is for the stages 1 and 2 of the development of the Busselton Wastewater Treatment Plant, Queen Elizabeth Avenue, Busselton, to an output of 6,750 cubic metres per day, and disposal of treated wastewater from the plant via an onsite wetland to the Vasse Agricultural drain and consequently to the Vasse Diversion Drain. Read more...