This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 24, 2021
Open cut dry mining of mineral sands and the processing of mined material through primary and secondary concentration plants and dry minerals separation. It includes the construction and operation of associated infrastructure and a modification to the intersection of Brand Hwy with Wannamal Road West. Read more...Last updated: January 22, 2021
Tronox Management Pty Limited proposes to develop the Cooljarloo West Titanium Minerals Project, 30 kilometres west from Cervantes, Shire of Dandaragan. The proposal involves the dredge mining of three orebodies: Woolka, Harrier and Kestrel. The proposal will require movement of the mining dredge and ore processing plant (concentrator) from the existing Cooljarloo Mine to Cooljarloo West and back again via flotation across an open channel. Read more...Last updated: July 30, 2014
The extension of open pit mining of mineral sands by dredging and dry mining adjacent to existing operations. Existing dry mining and processing practices, plant and equipment will be used. Approximately 3.1 million tonnes of ore will be extracted, slurried and processed by the dry mine concentrator to extract heavy mineral concentrate for transporting to the Chandala facilities. Inquiry under s46 to amend condition 7-1 of Ministerial Statement 790 . Read more...Last updated: March 16, 2009
The extension of open pit mining of mineral sands by dredging and dry mining adjacent to existing operations. Existing dry mining and processing practices, plant and equipment will be used. Approximately 3.1 million tonnes of ore will be extracted, slurried and processed by the dry mine concentrator to extract heavy mineral concentrate for transporting to the Chandala facilities. Read more...Last updated: November 10, 2000
The proposal is to mine titanium minerals from Orebodies 27, 200 and 28000, adjacent to the southern mining operations of the existing Cooljarloo Mineral Sands mine, located 10 kilometres north-west of Cataby, Shire of Dandaragan. Read more...Last updated: April 9, 1996
The proponent, Tiwest Joint Venture (Tiwest), seeks an amendment to the environmental conditions of Ministerial Statement 59 under Section 46 of the, Environmental Protection Act 1986, , to allow the synthetic rutile plant at Chandala an increase in nameplate production from 130,000 to 200,000 tonnes per annum (tpa) of synthetic rutile. The plant was originally assessed by the Environmental Protection Authority (EPA) in December 1988 and was approved by the Minister for the Environment to build... Read more...