This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 7, 2022
DevelopmentWA proposes to subdivide Lot 40 (No. 217) Devlin Road, Wellesley (Shire of Harvey) into approximately 34 lots to facilitate future industrial development. Areas of the Marriott Road reserve (Lots 41 & 42) are also proposed to be cleared to facilitate the safe movement of vehicles to and from the site and for upgrading of electrical services. The proposal would include a total development envelope of 119 hectares, including proposed clearing of up to 27.1 hectares of native... Read more...Last updated: April 5, 2022
Doyles Lime Service Pty Ltd proposes limestone and sand excavation approximately 4.5 km north of the Preston Beach townsite, Shire of Waroona. Read more...Last updated: March 15, 2022
The requested change relates to changing condition 9 in order to contemporise the condition with the Environmental Factor Guideline – Greenhouse Gas (GHG) Emissions (EPA 2020) Read more...Last updated: February 2, 2022
Change to Condition 9 (Rehabilitation) to remove reference to northern portion of Lot 2 Read more...Last updated: January 31, 2022
APH Contractors proposes to extract approximately 2.2 million bank cubic metres of sand from 22.87 hectares over a period of 20 years at an annual extraction rate of 100,000 – 120,000 tonnes per year. Sand will be extracted to a maximum depth of 20m Australian Height Datum (AHD). It is proposed that sand extraction will continue from east of Gelorup Hill and move progressively southwards in 18 sand extraction blocks, each between one and two hectares. Embankments will be restored to 1:4 (14o)... Read more...