This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 6, 1995
The proponent, Western Power, proposes to dispose of about 6,700 m 3 /d of clear saline water from the Collie Power Station via a 68 km pipeline to the ocean at the northern end of the Leschenault Peninsula north of Bunbury. The saline water to be discharged would have a Total Dissolved Solids (TDS) level of 3,200 to 5,000 g/m 3 , and have ambient temperature. The main constituent would be sodium chloride or common salt. This water, although unsuitable for the power station, could be used by... Read more...Last updated: July 17, 1995
Inquiry under s46 regarding a proposal to increase the generating capacity of the Pinjar station by a nominal 340MW. This increased capacity would be provided through the installation of: a fourth Frame 9 (nominally llOMW) gas turbine, together with; four waste heat boilers and two 115MW steam turbines with associated infrastructure. This proposal will increase the total potential generating capacity of the Pinjar station from a nominal 575MW (7 times 37MW plus 3 times 105MW) to 915MW (575MW... Read more...