This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 21, 2018
This is the inquiry into a request for changes to Ministerial Statement 906 , relating to the Point Grey Marina. Read more...Last updated: August 1, 2012
The proposal is for the construction of an onshore marina (and associated boating infrastructure e.g. boat pens, jetties, navigational aids, entrance channel, protective groynes, public boat ramps and car parks) on the western side of the Point Grey peninsula. The proposal also includes the construction of a 2.5 kilometre navigation channel across the Harvey Estuary from the marina to the Dawesville Channel. Read more...Last updated: September 24, 2007
The proposed Peel Deviation project involves the construction of 52.1 km of dual carriageway freeway-standard highway from the future freeway link north of Mandurah to the existing Perth-Bunbury Highway (Old Coast Road) at Lake Clifton. Read more...Last updated: June 30, 2006
The proposal is to develop a mineral sand mine one kilometre north of the township of Waroona, which is approximately 140 km south of Perth. The area for assessment has been identified as Mining Tenements M70/735, M70/797 and M70/1089. Read more...Last updated: September 13, 2002
The proposal being assessed is for the diversion of 8 gigalitres a year (on average) (GL/yr) of unallocated water resources in the Samson Catchment to be diverted for public water supply, the construction of a pipe head dam and related infrastructure. The Samson Brook Redevelopment Scheme is a key element of the Water Corporation’s drought recovery plan. Read more...Last updated: February 21, 1994
This proposal involves the development of a canal estate with some similarities to one previously proposed at the same site, which was assessed by the Environmental Protection Authority in October 1992 and subsequently withdrawn by the proponent. The principal differences between the previous proposal and this proposal are: a reduction of the area proposed to be developed by approximately 30 hectares; and the ceding of approximately 69 hectares of privately owned land by the proponent to the... Read more...