This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 28, 2021
The Water Corporation are proposing to construct a new 12.5 km pressured wastewater pipeline, primarily along Gnangara Road, from the Barrambie Way Sewerage Pumping Station in Ellenbrook to the Gnangara Branch Sewer in Wangara. The total disturbance area for the proposal is 30 ha, with a total clearing of no more than 0.3 ha of native vegetation. Read more...Last updated: May 31, 2021
The Water Corporation propose to construct a seawater desalination plant to supply potable water to the town of Onslow, WA. Seawater intake and brine wastewater release will occur in Beadon Bay, approximately 1 km seaward from the shoreline. The desalination processing facility is to be located at Lot 551, 552 and/or 553 Beadon Creek Road, Onslow. The proposal will involve the installation of permanent subtidal infrastructure in Beadon Bay (intake head, brine diffusers and transport pipes), a... Read more...Last updated: January 28, 2019
The Water Corporation is proposing to divert wastewater from the Bullsbrook Waste Water Treatment Plant (WWTP) to the Beenyup WWTP, 20 km away. A new pipeline will be installed predominantly along the Great Northern Highway to the Millhouse Road Pump Station in Ellenbrook. The pipeline alignment traverses Main Roads WA and local government road reserves. The alignment is adjacent to Ellen Brook Nature Reserve, several Bush Forever Sites and intersects Bush Forever site 300 at Ellen Brook,... Read more...