This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: January 7, 2021
Alcoa of Australia have requested changes to conditions 8, 9, 10, 11 and 12 of Ministerial Statement 728 and 1069 in order to facilitate an increase in production to 3.3 million tonnes per annum (Mtpa). Read more...Last updated: February 9, 2001
Inquiry under section 46 of the, Environmental Protection Act 1986, to increase production at the Wagerup Alumina Refinery from 3.3 million tonnes to 3.65 million tonnes. Read more...Last updated: June 26, 1997
The previously approved proposal is to mine and process up to 2 Mtpa of lateritic gold ore from the Hedges deposit, which is located in State Forest 4 km south of Mt Wells and 12 km north-west of Boddington. Ore is extracted through an open cut mining operation and is hauled 7 km to the carbon-in-leach treatment plant where the gold is recovered and the tailings deposited in a tailings dam. Process water for the treatment plant is supplied from the raw water supply dam which is replenished by... Read more...Last updated: August 11, 1995
The proposal is to increase the capacity of Alcoa's Wagerup Refinery, located about 120 km south of Perth, from the current 1.7 Mtpa to 3.3 Mtpa of alumina, with a proportionate increase in production of bauxite from the mobile mining operations, currently located at Willowdale, about 8 km east of the refinery. Read more...Last updated: March 8, 1990
Alcoa of Australia Pty Ltd has been operating the Wagerup Refinery (Stage 1) near Waroona (100 km south of Perth) since 1984, under the Alumina Refinery (Wagerup) Agreement and Acts Amendment No 15 of 1978. This agreement covers a production capacity up to 2 mtpa (million tonnes per annum). Initially the refinery produced about 670,000 tpa, but fine tuning of the plant (currently under way) is expected to lift its capacity to 840,000 tpa of alumina. The expansion proposal referred to in this... Read more...