This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 6, 1995
The proponent, Western Power, proposes to dispose of about 6,700 m 3 /d of clear saline water from the Collie Power Station via a 68 km pipeline to the ocean at the northern end of the Leschenault Peninsula north of Bunbury. The saline water to be discharged would have a Total Dissolved Solids (TDS) level of 3,200 to 5,000 g/m 3 , and have ambient temperature. The main constituent would be sodium chloride or common salt. This water, although unsuitable for the power station, could be used by... Read more...Last updated: January 19, 1995
Inquiry under s46 regarding changing the implementation conditions of Ministerial Statement 144 . It is proposed that the refinery effluent, tailings pond liquor and recovered groundwater will be blended in the lined staging pond at Baldivis prior to feeding to the CMF plant. The filtrate from the CMF plant will be returned to the refinery site and treated in the existing reverse osmosis circuit. In addition to the CMF plant, WMC is reviewing current remedial plans, as well as short and long... Read more...