Last updated: June 29, 2016
The proposal is to develop an open cut coal mine at the Premier deposit in the Shotts Sub-Basin of the Collie Coal Basin. The Premier Coal Mine would supply approximately 2 million tonnes of coal per year to the proposed private power station due to be built by 1996. It is a proposed open cut coal mining operation which will have a life of 30 years and is on the scale of the Muja mining operation. The mining method will follow the practices being used in the existing open cut operations... Read more...Last updated: May 22, 2012
The project site is located approximately 15 kilometres south of Eneabba in the Shires of Coorow and Carnamah, Western Australia. The CWC Project involves open cut mining and supply of approximately 75 Mt of sub-bituminous grade coal to the proposed Coolimba Power Station at a rate of 2 to 2.5 Mtpa over 30 years. The South Eneabba Nature Reserve is at the southern end, east of the proposed mine, while the Lake Logue Nature Reserve is towards the northern end and on the western side of the... Read more...Last updated: January 13, 1995
Enquiry under section 46 of the, Environmental Protection Act 1986, for the proposed expansion of the Ewington open cut coal mine. The planned addition (Ewington II) is immediately east of Griffin’s previously approved Ewington mine (Ewington I), and approximately five and a half kilometres east of the town of Collie. Read more...Last updated: April 6, 1993
Inquiry under s46 into proposed amendments to changes to Ministerial Statement 234 issued on 2 April 1992, for Western Collieries Ltd's Premier coalmine project. The changes relate to Environmental Condition 6, which sets noise limits, and on an arbitration procedure which applies to all Environmental Conditions. Read more...Last updated: September 17, 1992
The proposal is to develop a vanadium oxide mine and processing plant on Windimurra Station (Wagoo Hills Vanadium Project) near Mount Magnet. A major portion of the energy requirements of the processing plant would be generated from coal supplied from a proposed new coal mine to be located near Mingenew (Mingenew Coal Project). Read more...Last updated: September 4, 1992
The Ewington Coalmine is a proposed open cut coal mining operation which is on the same large scale as the Muja mining operation. The mining method would follow the practices being employed at the Chicken Creek open cut operation near Muja in the Collie Coal Basin. This involves an open cut, strip mining operation using a dragline. The Collie Basin is a depression within the Archaean basement containing Permian coal-bearing sediments. The Basin covers an area of approximately 274km 2 and... Read more...Last updated: April 2, 1992
The proposal is to develop an open cut coal mine at the Premier deposit in the Shotts Sub-Basin of the Collie Coal Basin. The Premier area is about 10 kilometres east of Collie and consists mainly of State Forest managed by the Department of Conservation and Land Management. The Premier Coal Mine would supply approximately 2 million tonnes of coal per year to the proposed private power station due to be built by 1996. It is a proposed open cut coal mining operation which will have a life of 30... Read more...Last updated: August 7, 1990
This proposal involves two types of operation, a resource extraction stage and a product generating phase. The proposal is to mine peat from within the Lake Muir Nature Reserve, east of Manjimup, and to process the material into a range of carbon and other products. The mining would take place within coal mining leases over Tordit-Gurrup Lagoon., Note:, The proposal was withdrawn by the proponent on 7 August 1990. Read more...Last updated: January 18, 1988
The proposal is for a briquetting plant at Collie, Western Australia, approximately 160 km south of Perth. The project is in two stages. Stage 1 is the construction of a plant to produce 30,000 tonnes/year (t/y) of various types of briquettes. The plant will also produce 70,000 t/y of coal char, some for use in briquette manufacture and some for sale. Stage 2 would be the upgrading of the plant to 120,000 t/y briquette production. The briquettes would be made utilising coal from Collie and... Read more...