Last updated: November 14, 2023
The proposal is to construct and operate a resource recovery facility within the existing Red Hill Waste Management Facility, City of Swan, for the processing of waste to produce energy, using either anaerobic digestion technology or gasification technology. Read more...Last updated: November 14, 2023
Changes to condition 3 of Ministerial Statement 976 in order to extend the Time Limit for Authorisation for substantial commencement of the proposal. Read more...Last updated: February 1, 2022
Changes to condition 7 to remove reference to the onsite brickmaking facility. Read more...Last updated: January 31, 2022
To build and operate a waste to energy plant on Lot 9500 Leath Road, Kwinana in the Kwinana Industrial Area. Read more...Last updated: July 31, 2017
Elan Energy Matrix Pty Ltd proposes to construct and operate a Tyre Resource Recovery Facility to recycle used tyres at 9 Fargo Way Welshpool, approximately 12 kilometres southeast of Perth within a ‘General Industry’ zone in the City of Canning. The proposal will involve thermal processing of used tyres to produce carbon black (material derived from char), steel wire, oil and process gas using an indirect fired thermal conversion unit. The plant will be located within enclosed buildings.... Read more...Last updated: November 30, 2016
The Site is approximately 16.9 ha and is proposed to be remediated and regenerated. It was previously mined for building and construction sands and was later used as a licensed “inert” landfill. It has been reported that non-approved waste streams were disposed of at the Site. In October 2010 following a compliance inspection the Site was classified “Contaminated – Remediation Required” under Section 13 of the Contaminated Sites Act 2003 The proponent is proposing to redevelop the area by... Read more...Last updated: September 19, 2016
The proposal is to develop a Waste Transfer and Resource Recovery Facility approximately 10 kilometres from Perth at 25 Jackson Street, Bassendean in the Bassendean Industrial Area. The proposal would include: a Materials Recovery Facility (MRF) for the processing of co-mingled recyclables; acceptance, short term stockpiling and baling of source separated recycled commodities; glass crusher for management of waste glass from the MRF; a metal shredder for the processing of metal commodities; a... Read more...Last updated: April 26, 2016
The proposal is to construct and operate a Wood Waste to Energy Plant at the existing Hazelmere Recycling Centre on Part Lot 100 and Lot 301, Lakes Road, Hazelmere. Read more...Last updated: January 20, 2015
To build and operate a Waste to Energy and Materials Recovery Facility on Lot 1 Office Road, 3 kilometres north-east of Rockingham in the Rockingham Industrial Zone. Read more...Last updated: January 24, 2001
The proposal is for a regional waste processing facility within the Kwinana Heavy Industrial Estate. The site is located on the Swan Coastal Plain approximately 30 kilometres south west of the Perth Central Business District and 3 kilometres north-west of the Town of Kwinana. The site is a large undeveloped piece of land which is adjacent to the British Petroleum (BP) refinery. The nearest residences are located to the north east in Hope Valley (approximately 2.6 kilometres) and to the east in... Read more...