Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions. Read more...Last updated: September 30, 2024
The Proposal involves the reactivation and expansion of a gold mining area approximately 2.5 kilometres south of Coolgardie in the Goldfields region of Western Australia. Key elements include the development of the Alicia open pit, expansion of the Dreadnought open pit and waste rock landform, haul road and ancillary infrastructure. Mined ore will be hauled for processing at the nearby Three Mile Hill plant, with tailings to be deposited in existing tailings storage facilities. A total of... Read more...Last updated: August 19, 2024
Crimson Metals Pty Ltd is proposing to develop the Mount Gibson Gold Project, located approximately 280 km northeast of Perth and less than 10 km east from the Great Northern Highway, in the Avon Wheatbelt region of Western Australia. Substantial mining occurred in the 1980’s and 1990’s and as a result, historical disturbance and infrastructure remain in the area. The proposal encompasses the re-opening and enlargement of existing open cut mines, utilisation of existing infrastructure where... Read more...Last updated: December 22, 2023
Rio Tinto Winu Pty Limited (the Proponent) proposes to develop the Winu Project (the Proposal). The Proposal is a new copper-gold mine located approximately 300 km south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia within both the Nyangumarta people’s and the Martu people’s Native Title Determination Areas. The Proposal conceptual footprint will require the clearing of up to 4,868 ha of native vegetation within a proposed 37,344 ha Development... Read more...Last updated: June 27, 2022
Marda Operations Pty Ltd propose to develop a gold mining project, approximately 140 kilometres north of the town of Southern Cross within the Shire of Yilgarn. The proposal will include mining below the groundwater table by conventional open cut methods and ore will be transported offsite for processing. The proposal also includes a waste rock landform, mine ore pad, topsoil and low grade stockpiles and supporting infrastructure. The proposal is adjacent to the proposed Die Hardy Range... Read more...Last updated: May 30, 2022
The Bellevue Gold Project is a historic gold mining operation located approximately 40 kilometres north of Leinster in the Northern Goldfields region. The proposal is for the recommencement of operations at the Bellevue Gold Project and involves extensions to existing mines and excavation of new open pits, associated mine dewatering, onsite processing and waste disposal. The proposal requires a disturbance of 363.2 hectares (ha) within a development envelope of 1,030 ha. The proposed life of... Read more...Last updated: November 8, 2021
The proposal is for the dewatering of up to 1 gigalitre per annum from the existing underground component of the Bellevue Gold Mine, to allow safe access for exploration drilling. This will occur on mining leases M36/24 and M36/25, 40km NW of Leinster. Read more...Last updated: April 30, 2018
Ramelius Resources Ltd propose to extend the life of the Edna May Gold Project operations by developing a new open pit immediately to the west of the existing operations. The project implementation would result in disturbance of up to 55.3 hectares of vegetation. The Edna May Gold Project is located approximately 1 km north-west of the township of Westonia and 312 km east of Perth. Read more...Last updated: December 8, 2016
Southern Cross Goldfields Limited proposes to develop an open pit gold mine operation and gold processing plant 150 kilometres north of Southern Cross. The proposal would involve mining 1.6 million tonnes (Mt) of ore and 8.2 Mt of waste rock over a life of 2.5 years at three pit locations; Marda Central, King Brown and Golden Orb. The processing plant, tailings storage facility, and two out of four of the waste rock landforms would be located at Marda Central. The remaining two waste rock... Read more...Last updated: December 7, 2016
The proposal referred to the Environmental Protection Authority is the Hidden Secret underground Mine. Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) proposes to mine for gold at the Hidden Secret ore body. Hidden secret is an underground ore body located east of Williamstown, 350 metres east of the Mt Charlotte underground mine. The Mt Charlotte Underground Mine is operated by KCGM and is located adjacent to the City of Kalgoorlie-Boulder, approximately 600 kilometres east of Perth. Mining... Read more...Last updated: April 22, 2013
Minjar Gold Pty Ltd project involves varying the current status of the mine from Care and Maintenance to Operating, expanding a series of existing pits, developing new deposits and making a small addition to the accommodation facilities. The project has an established Carbon in Leach processing facility and tailings storage facility and existing approvals to operate (Works Approval and approved Mining Proposals). Minjar Gold plans to produce gold from a chain of open pits extending over a 50 km... Read more...