Construction of an Advanced Water Recycling Plant at the Beenyup Wastewater Treatment Plant and the construction of water recharge and conveyance infrastructure to recharge up to 14 GL of recycled water that meets Australian drinking water standards to the Leederville and Yarragadee aquifers.
Attachment 1 to Ministerial Statement 1065 - Increase in the development envelope to allow for laydown areas and pipe stringing; and a change in the alignment of the recharge pipeline and development envelope to allow for greater lengths of trenchless construction – change to proposal approved under s45C on 7 May 2018.
Attachment 2 to Ministerial Statement 1065:
Changes:
- modified location and alignment of the pipe being installed using trenchless technology including relocation of the two drill pits at either end of the 'trenchless technology' instalation
- addition of approximately 50 metres of pipe between the new trenchless technology installation and the approved alignment which will be constructed using open trench construction methods; and
- removal from the develpment envelope of approximately 385 metres (m) of pipe installation.
Change to proposal approved under s45C on 4 December 2018.