First Attachment to Statement 523 - Expand existing waste rock dump area by 38ha, develop a new waste rock dump with an area of 22ha, and develop two stockpile areas with a combined footprint of approximately 15ha - change approved under s45C on 25 February 2005.
Second Attachment to Statement 523 - Development of a range of infrastructure, duplication of a rail loop, changes to site camp and sewerage treatment facilities - change approved under s45C on 25 February 2005.
Third Attachment to Statement 523 - To the description in the Consultative Environmental Review for Statement 417 and to Schedule 1 of Statement 523, approved under s45C on 12 May 2006.
Attachment 1 to Statement 523 - Increase of dewatering cap (shared with Statement 695) to 35 GL/a - change approved under s45C on 16 July 2009.
Attachment 2 to Statement 523 - To develop a new pit cutback near Phil's Creek, and to relocate the position of an approved Junction Central waste fines cell - change to proposal approved under s45C on 16 June 2010.
Attachment 3 to Statement 523 – to increase the site footprint by 225ha, to allow for additional ore stockpiles and associated infrastructure (within the proposed footprint increase area), to set an updated footprint figure for the site, and adjust the site maximum mining rate to 36Mt/a – change to proposal approved under s45C on 15 December 2011.