Newcrest Mining Limited, Telfer Project, Power Supply and Infrastructure Corridor, Port Hedland to Telfer Gold Mine, Great Sandy Desert (s46)
Clay Excavation Lots 7, 20, 60, 63, and 64 previously part lot 1 and lots 222, 27, 26, 25, 28 and 7 Hallett and Copley Roads, Upper Swan (s46)
Section 46 Change to Conditions - Cape Richie Seawater Desalination Plant – Ministerial Statement 904
Dredging Program Dampier Port Upgrade to a Throughput Capacity of 120 Million Tonnes Per Annum (s46) [1646]