Project Proponent Department of Treasury - Strategic Projects Proposal description The referral received by the EPA is for the construction and operation of the stadium. The EPA considers that the main environmental issues are associated with the pre-construction site works, which will stabilise and prepare parts of the site before the main construction phase. The site was previously used as a landfill facility and has been classified as "possibly contaminated - investigation required" under the Contaminated Sites Act 2003. Preconstruction site works will effectively compress the unstable fill layer, which has resulted from historical use as a landfill. Surcharging techniques will be applied, where clean fill is placed to load the ground and compact the site. Wick drains will also be installed to increase the rate that groundwater drains from the Swan River Alluvium soils beneath the fill layer. Once settlement is achieved, excess clean .fill will be removed. Region Perth Referred under EP Act s38 Industry sector Infrastructure Last updated January 11, 2013 Current Status Decision on whether to assess has been published 2. Decision on whether to assess this proposal Chair's Determination Referral examined, preliminary investigations and inquiries conducted. Proposal not to be assessed under Part IV of the EP Act. Advice given (Appealable) Extract of determination Chairman's Determination - New Perth Stadium Project (PDF, 24.28 KB) Preliminary Environmental Factors Terrestrial Environmental Quality Hydrological Processes Inland Waters Environmental Quality Public advice Public Advice - New Perth Stadium (PDF, 122.2 KB) Date published Monday, 5 November, 2012 4. EPA Report on assessment Key Environmental Factors Terrestrial Environmental Quality Hydrological Processes Inland Waters Environmental Quality