Attachment 1 to Statement 0840 – Change to the Tug Harbour Extension dredging footprint area (i.e. updated Table 4 and Figures 2, 4b and 4c) – change to proposal approved under s45C on 12 May 2011.
Attachment 2 to Statement 0840 - The proponent shall ensure that the implementation of the proposal does not cause a direct loss of Benthic Primary Producer Habitat in excess of 1.4 hectares. Interim Implementation Condition 8-1 approved under s46A on 19 May 2011.
Note: A change to condition 8-1 of Ministerial Statement 0840 was approved by the Minister for Environment on 31 October 2011 in Statement 0876. Download Ministerial Statement 0876 with the new condition.
Attachment 3 to Statement 0840 – Additional dredging – increase in “large dredge area” and “tug harbour dredge area” (replaced Figure 5, Table 4 and Key Characteristics Table – change to proposal approved under s45C on 22 December 2011.
Attachment 4 to Statement 0840 – Additional clearing – additional 46 ha of terrestrial clearing. Inclusion of figure 7 depicting Terrestrial Component of the Proposed Footprint – change to proposal approved under s45C on 28 March 2012.