Information
Attachment 2 to Ministerial Statement 677 - Changes:
• Create a total disturbance footprint of 574 hectares, by combining the following areas of disturbance:
- Road formation – approximately 474 hectares; and
- Material sources – approximately 100 hectares.
• Remove the following elements which are no longer considered Key Proposal Characteristics:
- Design speed (110 kilometres per hour).
- Railway crossings (One road-over-rail bridge. Four new level crossings.)
Ministerial Statement File
Date of approval
Go to the full case view of this Proposal