St Ives Gold Mine – Beyond 2018 Project (Revised Proposal)

Project
Proposal description

St Ives Gold Mining Company Pty Limited proposes to expand the existing open-cut and underground gold mining developments with 2,061 hectares (ha) of disturbance. The proposal is located in Lake Lefroy approximately 20 kilometres south east of Kambalda (Shire of Coolgardie).

The revised proposal would include an additional disturbance of 5000 ha:

  • additional lake-based disturbance of up to 2,000 ha; and
  • additional land-based disturbance of up to 3,000 ha.
Assessment Number
2113
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
2. Decision on whether to assess this proposal
3. Assessment
Scoping
Environmental scoping document for public comment
Environmental Review
Date Published (Environmental Review documentation)
Date published (Proponent response to submissions)
4. EPA Report on assessment
EPA Report Number
1645
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Ministerial Statement
Post-assessment changes
s. 45C amendments

Attachment 1 to Statement 1128 - Increase in the size of the development envelope by 572 hectares. Inclusion of a hybrid energy-source powered microgrid (hybrid microgrid) within the land-based operations. Change to conditions approved 18 December 2023.  

Attachment 2 to Statement 1128 - Increase to extent of development envelope by 4 ha. Realignment of a transmission line associated with the hybrid energy-source powered microgrid.. Change to conditions approved 19 April 2024.  

Date of approval s. 45C