ProjectProponent: Lake Roe Gold Mining Pty LtdProposal description: The proposal is to construct and operate a greenfield open cut and underground gold mine approximately 150 kilometres (km) east of the City of Kalgoorlie Boulder in the eastern Goldfields region of Western Australia (WA). The proposal is located on the western margin of Lake Roe and will comprise associated ore stockpiles, waste rock landforms, mining related and general supporting infrastructure and a 50 km service corridor. Mining will occur below groundwater level requiring dewatering of the open pit and underground mines. The proposal will mine an estimated 7.85 million tonnes of ore over a 9 year mine life. The mined ore will be transported offsite for processing at the Rebecca processing hub. The Development Envelope is 1,543 hectares (ha) with a Disturbance Footprint of 557.7 ha. Region: Goldfields EsperanceReferred under EP Act: s38Industry sector: GoldLast updated: March 25, 2026Current Status: Seven-day public comment period closed 1. ReferralComment on this referral: Roe Gold ProjectComment period: Wednesday, 25 March, 2026 to Tuesday, 31 March, 2026Referral documentation: Referral form Proposal content document Supporting document Appendix A_ Roe Gold Project Bombara Hydrogeological Dewatering Assessment.pdf Appendix B_ Bombara Project Lake Roe Flood Depth Assessment.pdf Appendix C_ Roe-Rebecca Haul Road- Surface Water Environmental Assessment.pdf Appendix D_ Lake Roe Hydraulic Behaviour Desk Study.pdf Appendix E_ Preliminary Risk and Discharge Assessment for Lake Roe.pdf Appendix F_ Rebecca to Roe Haul Road, Detailed Flora and Basic Fauna Survey.pdf Appendix G_ Lake Roe Project Detailed Flora Survey.pdf Appendix H_ Lake Roe Project Short Range Endemic (SRE) Invertebrate Survey and Assessment.pdf Appendix I_ Short Range Endemic Habitat Mapping for the Roe and Rebbecca Gold Projects Haul Road.pdf Appendix J_ Lake Roe Gold Project Subterranean Fauna Level 1 Assessment.pdf Appendix K_ Basic Vertebrate Fauna Survey Rebecca to Lake Roe Haul Road.pdf Appendix L_ Basic Vertebrate Fauna Survey Lake Roe Gold Project.pdf Appendix M_ Lake Roe Project -Kopai Crescent and Bombara Waste Characterisation.pdf Appendix N_Lake Roe Gold Project- Baseline Aquatic Ecology Study.pdf Appendix R_ Aquatic Ecology Report.pdf