ProjectProponent: State Energy Commission of Western AustraliaProposal description: In 1991, the State Energy Commission of Western Australia presented the Environmental Protection Authority with a number of alternatives for supplying power to the proposed Beenup mineral sands mine. These alternatives included on-site generation by the mining company, alternative technologies such as solar and wind power and a number of transmission line options. Assessment Number: 813Region: South WestReferred under EP Act: s38Industry sector: InfrastructureLast updated: March 23, 1994Current Status: Ministerial Statement published 2. Decision on whether to assess this proposalChair's Determination: Consultative Environmental ReviewPreliminary Environmental Factors: Flora and VegetationTerrestrial Environmental QualityDate published: Saturday, 19 June, 1993 3. AssessmentEnvironmental ReviewPublic submissions: Friday, 6 August, 1993 to Monday, 6 September, 1993Environmental Review documentation: CER - Proposed 132kv transmission line, Manjimup to Beenup Mineral Sands Mine (PDF, 23.91 MB) 4. EPA Report on assessmentEPA Report Number: 707EPA Report: EPA Report 707 (PDF, 1.57 MB)Key Environmental Factors: Flora and VegetationTerrestrial Environmental QualityDate published: Thursday, 14 October, 1993