Eureka 3D Marine Seismic Survey

Project
Proponent: 
Proposal description: 

Pilot Energy Limited proposes to undertake marine seismic surveying 7 kilometres off the mid-west coast of Western Australia, south of Dongara. The survey aims to acquire three-dimensional seismic data to improve understanding of subsurface geology and assess potential natural gas resources.

The proposal involves a purpose-built survey vessel traversing the survey area, generating seismic sound using controlled releases of compressed air. The vessels will tow 6 cables approximately 6,000 metres long to capture sound levels reflected from beneath the sea-floor. In shallower areas, seabed-mounted ocean bottom nodes will be temporarily deployed and later retrieved. No drilling, seabed excavation, or permanent infrastructure is proposed.

Region: 
Industry sector: 
Last updated: 
March 5, 2026
Current Status: 
Seven-day public comment period closed
Seven-day public comment period closed
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info