Project
Proponent: 
Hancock Energy (PBN) Ltd
Proposal description: 

The proposal involves the construction and operation of a Central Processing Facility (CPF) and associated infrastructure, including a buried central flowline and gas export pipeline in the Mid-West region of Western Australia (WA). The proposed location is approximately 350 kilometres (km) north of Perth and 25 km south‑west of Mingenew.
Gas produced from nearby developments, which are separate to this proposal, will be transported via a buried central flowline for processing at the CPF. Processed gas will be exported via a gas export pipeline from the CPF to the Dampier Bunbury Natural Gas Pipeline (DBNGP).
The Development Envelope is 1,326.9 hectares (ha), with an estimated Disturbance Footprint of 291.5 ha, including approximately 5.7 ha of remnant native vegetation.

Region: 
Mid West
Referred under EP Act: 
s38
Industry sector: 
Oil and gas
Last updated: 
May 5, 2026
Current Status: 
Seven-day public comment period open
Seven-day public comment period open
1. Referral
Comment on this referral: 
Belisama Gas Project
Comment period: 
Tuesday, 5 May, 2026 to Tuesday, 12 May, 2026
Referral documentation: 
PDF icon Belisama Gas Project Form Referral of a proposal under s38 Rev 0
PDF icon Belisama Gas Project Proposal Content Document Rev 0
PDF icon Belisama Gas Project Referral Supporting Document REV 0
PDF icon Appendix C1 - Belisama Conventional Gas Project Flora and Vegetation Survey (Biologic 2026a
PDF icon Appendix C2 - Basic and Targeted Terrestrial Fauna Survey for the Belisama Conventional Gas Project (Phoenix 202
PDF icon Appendix C3 - Belisama Conventional Gas Review of Black Cockatoo Assessment (Bamford 2026)
PDF icon Appendix C4 - Belisama Gas Project Inland Waters Assessment (HGG 2025)
PDF icon Appendix C5 - Belisama Conventional Gas Project Air Quality Assessment (MRP 2025a)
PDF icon Appendix C6 - Belisama Conventional Gas Project Greenhouse Gas Assessment Technical Report Case 1 (Greenbase 2026)
PDF icon Appendix C7 - Belisama Conventional Gas Project Greenhouse Gas Assessment Technical Report Case 2 (Greenbase 2026)
PDF icon Appendix C8 - Belisama Conventional Gas Project Independent Peer Review Greenhouse Gas Estimate (Evolveable 2026)
PDF icon Appendix C9- Geotechnical Investigation by Test Pitting – Belisama Gas Project (FCE 2025)
PDF icon Appendix C10 - Belisama Gas Project Visual Impact Assessment (ELA 2025)
PDF icon Appendix C11 - Environmental Noise Assessment – Belisama Gas Development Project (Lloyd George Acoustics 2025)
PDF icon Appendix D1 - Belisama_CEMP REV0
PDF icon Appendix D2 - Belisama Gas Project – Stormwater Management Plan (HGG 2026a)
PDF icon Appendix D3 - Belisama Gas Project – Technical Monitoring Guideline Groundwater and Surface Water (HGG 2026b)
PDF icon Appendix E - YSRC Letter of Support (YSRC 2026)

Source URL:https://www.epa.wa.gov.au/proposals/belisama-gas-project