Karara Iron Ore Project – Mine Life Extension

Project
Proponent: 
Karara Mining Limited
Proposal description: 

Karara Mining Limited is seeking to revise its existing Karara Iron Ore Mine, located 320 km north-northeast of Perth in the Midwest Region of Western Australia.

The revised proposal includes additional ground disturbance to support the revised Life of Mine strategy, including a revised development envelope, extension of the tailings storage facility and waste rock landform, incorporation of the areas previously approved under the Mungada Iron Ore Project (MIOP) (MS 806) and areas required for maintenance of the infrastructure previously approved under Part V of the Environmental Protection Act 1986 (clearing permits), which will be utilised for the ongoing operations at Karara.

The revised proposal would consist of new disturbance of 1,522 hectares (ha), with a total disturbance area no greater than 5,040 ha; and a revised development envelope of 13,557 ha.

The proposal is predicted to increase the life of mine from approximately 25 years to approximately 40 years.

Proposal Content Document: 
PDF icon Proposal Content Document - Rev 4 - Dec 2022.pdf
Assessment Number: 
2369
Region: 
Mid West
Referred under EP Act: 
s38
Industry sector: 
Iron Ore
Last updated: 
October 16, 2023
Current Status: 
Assessment on Proponent Information – Request for More Information published
1. Referral
Comment period: 
Monday, 21 March, 2022 to Wednesday, 30 March, 2022
Referral documentation: 
PDF icon Referral Form
PDF icon Proposal Content Document
PDF icon Supporting Document
PDF icon A1 - Umwelt Environment Consultants, November 2021. Detailed and Targeted Flora and Vegetation Assessment.pdf
PDF icon A2 - Umwelt Environment Consultants, 2022. Flora, Vegetation and Fauna Impact Assessment for Karara Project Expansion (Draft).pdf
PDF icon A3 - Curtin University Centre for Mine Site Restoration, December 2021. EPBC fauna stress monitoring - Curtin University Centre for Mine Site Restoration (CMSR Report).pdf
PDF icon A4 - Woodman Environmental, April 2020. Review and Gap Analysis of Previous Flora and Vegetation Assessment.pdf
PDF icon A5 - EPBC Act Protected Matters Search (January 2022).pdf
PDF icon B1 - KML, October 2020. Environmental Procedure Potentially Acid Forming Materials Management CORP-EN-PRO-1051.pdf
PDF icon B2 - Red Earth Engineering, October 2021. Dry Stack TSF Review.pdf
PDF icon B3 - KML, June 2020. Environmental Management Plan CORP-EN-PLN-1020.pdf
PDF icon B4 - KML, May 2020. Performance Review Report CORP-EN-REP-1144.pdf
PDF icon B5 - KML, August 2021. Annual Compliance Assessment Report CORP-EN-REP-1169.pdf
PDF icon C1 - Greenbase, December 2021. Greenhouse Gas Emissions Annual 2021.pdf
PDF icon D1 - Karara Mining Limited – DPaW, Novmeber 2013. Memorandum of Understanding.pdf
PDF icon s38-KIOP-MLE-Final_Part1.pdf
PDF icon s38-KIOP-MLE-Final_Part2.pdf
Amendment of referred proposal under s. 38C
s. 38C notice: 
PDF icon s38C Application Form.pdf
PDF icon Summary of reasons - s. 38C - 070323.pdf
PDF icon Supporting Information - Rev 4 - Dec 2022.pdf
Date of approval s. 38C: 
Tuesday, 7 March, 2023
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Additional Assessment Information (public review)
Extract of determination: 
PDF icon Karara Iron Ore Project – Mine Life Extension (significant amendment to the Karara Iron Ore Project)
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Landforms
Subterranean Fauna
Terrestrial Fauna
Inland Waters
Date published: 
Monday, 26 June, 2023
3. Assessment
Request for further information
Date: 
Monday, 16 October, 2023
File upload: 
PDF icon Notice under s.40(2)(a) Request for further information - 161023.pdf

Source URL:https://www.epa.wa.gov.au/proposals/karara-iron-ore-project-%E2%80%93-mine-life-extension