Ashburton Infrastructure Project

Project
Proposal description

The Proposal is located in the Pilbara region of Western Australia within a development envelope of 20,821 ha and clearing no more than 1,564 ha.

Onslow Infraco Pty Ltd (herein MRL a wholly owned subsidiary of Mineral Resources Limited) is proposing to develop:

• A fully sealed private haul road, approximately 125km in length

• Gas pipeline and ancillary haul road infrastructure.

• Storage and bulk handling of ore at the Port of Ashburton.

• Dredging a dedicated berthing pocket adjacent to the existing Material Offloading Facility and offshore disposal of dredge spoil to existing spoil disposal areas.

• A modular jetty wharf and ship loader.

• Use of five offshore anchorage areas for transhipment of ore to Ocean Going Vessels and

• Ancillary landside infrastructure.

Within the port; landside and marine facilities will be developed to support export of up to 40 million tonnes of ore per annum (Mtpa) over a minimum 30-year period. The proposal is located within an area of existing pastoral, mining, and industrial use.

Assessment Number
2320
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
Referral documentation
2. Decision on whether to assess this proposal
3. Assessment
Environmental Review
Environmental Review documentation
Date Published (Environmental Review documentation)
Date published (Proponent response to submissions)
Minor or preliminary work under s. 41A(3)
Date of approval s. 41A(3)
Change to proposal during assessment under s. 43A
Date of approval s. 43A
4. EPA Report on assessment
EPA Report Number
1733
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Post-assessment changes
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email