EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Orebody 32 Below Water Table Creek Discharge

Orebody 32 Below Water Table Creek Discharge

Project
Proponent: 
BHP Iron Ore Pty Ltd
Proposal description: 

BHP proposes to construct and operate a creek discharge at Homestead Creek to manage up to 60 megalitres per day (up to 16.2 gigalitres per annum) of surplus water from the existing Orebody 32 Below Water Table (BWT) mining operations, located approximately 3.6 kilometres northeast of Newman.

The existing Orebody 32 BWT mine includes below water table mining and the construction of a surplus water pipeline to Ophthalmia Dam. The proposal is a derived proposal authorised by the Pilbara Expansion Strategic Proposal, Ministerial Statement (MS) 1105.

The proposal includes:

  • the construction of a short offtake pipe from the existing Orebody 32 BWT surplus water pipeline
  • a discharge outlet to Homestead Creek
  • a series of aeration ponds, if construction is required, to prevent the persistent formation of calcium carbonate precipitate in Homestead Creek.

The proposal will be located within a 174 hectare (ha) development envelope and will require the clearing of up to 40 ha of native vegetation.

Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Iron Ore
Last updated: 
January 20, 2026
Current Status: 
Seven-day public comment period closed
Seven-day public comment period closed
1. Referral
Comment on this referral: 
Orebody 32 Below Water Table Creek Discharge
Comment period: 
Wednesday, 14 January, 2026 to Tuesday, 20 January, 2026
Referral documentation: 
PDF icon 0. OB32 BWT Creek Discharge - Referral Form.pdf
PDF icon 0. OB32 BWT Creek Discharge Derived Proposal - Final.pdf
PDF icon 0. OB32 Creek Discharge Proposal Content Document.pdf
PDF icon App 02 - DP clearing tracker.pdf
PDF icon App 03 - Homestead Creek Flood Study.pdf
PDF icon App 04 - 311012-00724-HY-MEM-00001-A.pdf
PDF icon App 04 - PREP-040-G-12127_0.pdf
PDF icon App 04 - Summary OB32 Wetting Front Draft Final.pdf
PDF icon App 05 - ENV-NEBO OB25 West Targeted Siognificant Fauna Survey Biologic 28112024.pdf
PDF icon App 05 -ENV- Eastern Ridge OB25 West Additional Targeted Vertebrate Fauna Survey Biologic 240425.pdf
PDF icon App 06 - BHP Homestead and Fortescue River Report_Rev 4_280922 (1) - Aquatic Fauna Survey Indopacific.pdf
PDF icon App 06 - ENV- Fortescue River Aquatic Fauna Monitoring FY21 IndoPacificReport_Rev 0_20032023.pdf
PDF icon App 07 - OB32 BWT DP GW EIA__V0.pdf
PDF icon App 08 - Groundwater Monitoring Data.pdf
PDF icon App 09 - BHP OB32 DPS Precipitate Study report v1.8.pdf
PDF icon App 10 - 311012-00724-CI-REP-00010-RA - Ponds - Prelim Design Report.pdf
PDF icon App 11 - OB32 BWT Water Management Plan.pdf
PDF icon App 12 - 20250722_FY2024 Derived Proposal Rehabilitation Report_V1.pdf
PDF icon App 12 - Eastern Ridge MCP Submission - Cover Letter (Dec 2025).pdf
PDF icon App 12 - Eastern Ridge MCP_Rev 4.0_PW Protected.pdf
PDF icon App 13 - FV OB32SW Detailed Flora and Vegetation Assessment Spectrum 2022.pdf
PDF icon App 14 - ENV- OB32 Settlement Pond Flora and Vegetation Survey Biologic 20250625.pdf
PDF icon App 15 - Newman-OB32 BWT Creek Discharge_FVEMP.pdf
PDF icon App 16 - OB32SW MNES Vertebrate Fauna Survey Biota 2022.pdf
PDF icon App 17 - OB32 BWT Creek_IRP_20251215.pdf
PDF icon App 18 - Social Surrounding Recommendations.pdf

Source URL:https://www.epa.wa.gov.au/proposals/orebody-32-below-water-table-creek-discharge