EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Newmont Boddington Mine Life of Mine Extension Amendment

Newmont Boddington Mine Life of Mine Extension Amendment

Project
Proponent: 
Newmont Boddington Gold Pty Ltd
Proposal description: 

The proposal is for the continuation and expansion of existing operations at the Newmont Boddington Mine which is located approximately 12km northwest of Boddington and 130km southeast of Perth.

The proposal is a significant amendment to the existing proposal approved under Ministerial Statement 971 and comprises additional footprint for the safe construction and operation of the future tailings dam RDA2. The proposal also includes a range of other activities including but not limited to bauxite preservation and stockpiling as required, expansion of the access road from Albany Hwy and potential discharge of treated water to the Hotham River.

Altogether the proposal would increase the clearing of native vegetation by 528 ha to 5,963 ha and overall disturbance by 1,560 ha to 8,483 ha.

The mine life is proposed to be extended by 5 years to 2046.

Assessment Number: 
2507
Region: 
Peel
Referred under EP Act: 
s38
Industry sector: 
Gold
Last updated: 
August 4, 2025
Current Status: 
Decision on whether to assess has been published
Decision on whether to assess has been published
1. Referral
Comment on this referral: 
Newmont Boddington Mine Life of Mine Extension Amendment
Comment period: 
Tuesday, 15 July, 2025 to Monday, 21 July, 2025
Referral documentation: 
PDF icon Referral Form.pdf
PDF icon Proposal Content Document.pdf
PDF icon Supporting Document.pdf
PDF icon Appendix B1 Assessment of Flora and Vegetation on Worsley Mine Expansion PAA.pdf
PDF icon Appendix B2 Mattiske. 2021c Addendum - Assessment of Threatened and Priority Flora_ed_update_Oct 2023.pdf
PDF icon Appendix B3 Assessment of Flora and Vegetation Values on Residue Expansion Areas Newmont Boddington Gold.pdf
PDF icon Appendix B4 Memorandum Threatened and Priority Flora search for Newmont Boddington Gold Mine within the Residue Dam Expansion Area.pdf
PDF icon Appendix B5 Assessment of Flora and Vegetation Values on Vegetation Plots on Offset Area Newmont Boddington Gold Mine WA.pdf
PDF icon Appendix B6 Briefing Note GGDVMMP and Data Review Umwelt 2025 (1).pdf
PDF icon Appendix C1 Black Cockatoo Breeding Habitat Assessment - Phoenix - Final March 2023.pdf
PDF icon Appendix C2 Phoenix 2023 Black Cockatoo PHT Assessment.pdf
PDF icon Appendix C3 South32 Worsley Alumina Boddington Mine and Offset Properties -Numbat Habitat Assessment.pdf
PDF icon Appendix C4 Phoenix 2023 Four Phase Short Range Endemic Invertebrae Fauna Survey for the Worsley Mine Expansion Project.pdf
PDF icon Appendix C5 Targeted significant mammal and black cockatoo survey for the Boddington Gold Project.pdf
PDF icon Appendix D1 SLR Gringer Creek Aquatic Fauna Survey and Interim Site Specific Guideline Values Final July 2024 (1).pdf
PDF icon Appendix D2 SLR Boggy Brook Baseline Aquatic Fauna Survey and Interim Site Specific Guideline Values Final July 2024 (1).pdf
PDF icon Appendix D3 SLR Draft Hotham River Aquatic Fauna Survey and Interim Site-Specific Guideline Values Desktop Review.pdf
PDF icon Appendix D4 BigDog 2025 Mining Influence Review Final.pdf
PDF icon Appendix D5 BigDog Baseline Hydrological Assessment for RDA2 Final.pdf
PDF icon Appendix E1 ETA Newmont Boddington Residue Disposal Area 2 Development Dust Modelling Assessment May 2025.pdf
PDF icon Appendix E2 Herring Storer Acoustics Environment Noise Assessment Boddington Gold Mine Residue Disposal Area 2 May 2025.pdf
PDF icon Appendix E3 Ramboll 2022 Newmont Boddington - Air Dispersion Modelling.pdf
PDF icon Appendix E4 Ecoscape Newmont Boddington Gold Future Depositions Options Visual Impact Assessment.pdf
PDF icon Appendix G 110625 Newmont Boddington WDMMP Rev 0.pdf
PDF icon Appendix H 100625 Newmont Boddington_Terrestrial Fauna MP Rev 0.pdf
PDF icon Appendix I 100625 Newmont Boddington_Black Cockatoo MP Rev 0.pdf
PDF icon Appendix J 160525 Draft Biodiversity Management Strategy_Rev0.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon Newmont Boddington Mine Life of Mine Extension Amendment
Preliminary Environmental Factors: 
Greenhouse Gas Emissions
Social Surroundings
Flora and Vegetation
Terrestrial Fauna
Inland Waters
Date published: 
Monday, 4 August, 2025

Source URL:https://www.epa.wa.gov.au/proposals/newmont-boddington-mine-life-mine-extension-amendment