EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Proposed Browse to NWS Development - change to proposal under s. 43A

Proposed Browse to NWS Development - change to proposal under s. 43A

Project
Proponent: 
Woodside Energy Ltd
Proposal description: 

Woodside Energy Ltd has submitted an application under s.43A of the Environmental Protection Act 1986 to change the Proposed Browse to NWS Development proposal during the EPA’s assessment.

The proposed amendment includes a reduction in development envelope size to no longer overlap the Scott Reef shallow water benthic habitats or Sandy Islet, modifications to remove or relocate drilling units to avoid green turtle habitats, and the adoption of technology to minimise the risk of a loss-of-well control event.

The EPA has determined that the proponent’s amendment documentation should be subject to a four-week public review period, commencing 12 May 2025 and concluding 10 June 2025. The amendment documentation is provided under ‘3. Assessment’ below and public submissions can be made through the EPA’s Consult Hub.

Region: 
Kimberley
Industry sector: 
Oil and gas
Last updated: 
May 12, 2025
Current Status: 
STAGE 3
STAGE 3
3. Assessment
Change to proposal during assessment under s. 43A
s. 43A notice: 
PDF icon Cover Letter_s43A Application_Feb 2025 (signed) REDACTED_Redacted.pdf
PDF icon Attachment A_Form_Request to amend a proposal during assessment under s43A (signed) REDACTED_Redacted.pdf
PDF icon Attachment B_Proposal Content Document_Proposed Browse to NWS Development (State Component)_Feb 2025.pdf
PDF icon Attachment C_Independent Review of Torosa Well Blowout Risk Management_Final.pdf
PDF icon Attachment D_Woodside Browse to NWS Vessel Noise Modelling Report 4.0.pdf

Source URL:https://www.epa.wa.gov.au/proposals/proposed-browse-nws-development-change-proposal-under-s-43a