Project
Proponent: 
Greatland Pty Ltd
Notice of Change of Proponent: 
PDF icon Notice of Change of Proponent - 161224.pdf
Proposal description: 

Newcrest Operations Limited proposes to construct and operate the Telfer – Havieron Gold Mining Project (the Project). The Telfer Gold Mine is located about 55 km to the west of the Havieron Gold Mine and 400 km south-east of Port Hedland in the Great Sandy Desert region of Western Australia. The project includes: 

  • The open pit and underground mining and subsequent processing of gold-copper ore at the Telfer Gold with associated infrastructure including a 160 MW natural gas-fired power station, waste rock landforms, tailings storage facilities, accommodation village and borefields. 

  • A 440 km-long natural gas pipeline corridor from Port Hedland to the Telfer Gold Mine. 

  • The underground mining of gold-copper ore at the Havieron Gold Mine for processing at the Telfer Gold Mine, as well as the continued and/or expanded use of existing associated facilities at Havieron, including the underground decline to access the orebody, waste rock landforms, evaporation ponds, stockpiles, and accommodation village. 

  • The construction and operation of the Infrastructure Corridor between Telfer and Havieron to facilitate the transport of ore and other materials between Havieron and Telfer, including tailings and waste rock materials for the progressive backfilling of the Havieron Gold Mine, and the installation of a pipeline for water supply and a powerline within the corridor.

Proposal Content Document: 
PDF icon Proposal Content Document - November 2025.pdf
Assessment Number: 
2446
Region: 
Pilbara
Kimberley
Referred under EP Act: 
s38
Industry sector: 
Gold
Last updated: 
January 5, 2026
Current Status: 
EPA Report and Recommendations released - appeals open
EPA Report and Recommendations released - appeals open
1. Referral
Comment on this referral: 
Telfer - Havieron Gold Mining Project
Comment period: 
Tuesday, 9 May, 2023 to Tuesday, 16 May, 2023
Referral documentation: 
PDF icon Newcrest_Telfer-Havieron_Gold_Project_Referral_Supporting_Doc_v1-1.pdf
PDF icon Significant Amendment - Telfer-Havieron Gold Mining Project Mar2023.pdf
PDF icon Telfer-Havieron_Gold_Mine_Proposal_Content_Document_230404.pdf
PDF icon AppxB_Vegetation&Flora_Reports.pdf
PDF icon AppxC_Telfer-Havieron_SigSpeciesMP.pdf
PDF icon AppxD_Terrestrial_Fauna_Reports.pdf
PDF icon AppxE_Telfer-Havieron_GHG_Emissions_Assessment.pdf
PDF icon AppxF_Telfer-Havieron_Gold_Project_Prelim_GHGMP.pdf
PDF icon AppxG_Havieron_SubFauna.pdf
PDF icon AppxH_Preliminary_MCPweb.pdf
PDF icon AppxI_Havieron+Corridor_Surface_Water.pdf
PDF icon AppxJ_H3_Hydrogeological_Report_Havieron.pdf
PDF icon AppxK_Havieron_Soils_Report.pdf
PDF icon AppxL_Waste_Characterisation_Reports.pdf
PDF icon AppxM_Telfer-Havieron_Offset_Strategy.pdf
PDF icon AppxN_TelferMS605+606_CAR_2021+22.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Additional Assessment Information (public review)
Extract of determination: 
PDF icon Telfer – Havieron Gold Mining Project
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Subterranean Fauna
Terrestrial Environmental Quality
Terrestrial Fauna
Inland Waters
Date published: 
Monday, 27 May, 2024
3. Assessment
Environmental Review
Public submissions: 
Wednesday, 13 November, 2024 to Wednesday, 4 December, 2024
Make a submission: 
Telfer-Havieron Gold Mining Project - Additional Information
Environmental Review documentation: 
PDF icon Proposal Content Document (PCD).pdf
PDF icon Revised Referral Supporting Document - Rev 6.pdf
PDF icon RFI Appendix 1 - JBS&G Flora and Vegetation EPA RFI Responses Memo.pdf
PDF icon RFI Appendix 2 - Biologic Vertebrate Fauna EPA RFI Responses Memo.pdf
PDF icon RFI Appendix 2a - Reports of acoustic recorder analysis (6).pdf
PDF icon RFI Appendix 3 - MineEarth Mine Closure Plan EPA RFI Responses Memo.pdf
PDF icon RFI Appendix 4 - Rockwater Surface Water Assessment EPA RFI Memo (1).pdf
PDF icon RFI Appendix 5 - Worley Hydrogeology EPA RFI Responses Memo (1).pdf
PDF icon RFI Appendix 6 - Updated figures.pdf
PDF icon RFI- Response table.pdf
PDF icon Appendices cover and contents pages.pdf
PDF icon AppxA_Stakeholder Engagement Register.pdf
PDF icon AppxB_Flora and Vegetation Reports.pdf
PDF icon AppxC_Significant Species Management Plan.pdf
PDF icon AppxD_Terrestrial Fauna Reports.pdf
PDF icon AppxE_Greenhouse Gas Emissions Report.pdf
PDF icon AppxF_GHG Management Plan and Peer Review.pdf
PDF icon AppxG_Scope 3 Greenhouse Gas Assessment Report.pdf
PDF icon AppxH_Subterranean Fauna Reports.pdf
PDF icon AppxI_Preliminary Mine Closure Plan_Part1.pdf
PDF icon AppxI_Preliminary Mine Closure Plan_Part2.pdf
PDF icon AppxI_Preliminary Mine Closure Plan_Part3.pdf
PDF icon AppxI_Preliminary Mine Closure Plan_Part4.pdf
PDF icon AppxI_Preliminary Mine Closure Plan_Part5.pdf
PDF icon AppxJ_Surface Water Assessments.pdf
PDF icon AppxK_H3 Hydrological Report.pdf
PDF icon AppxL_Soil Characterisation Report.pdf
PDF icon AppxM_Waste Rock Characterisation Report.pdf
PDF icon AppxN_Offset Strategy.pdf
Date Published (Environmental Review documentation): 
November 13, 2024
Proponent response to submissions: 
PDF icon Response to Submissions 1 December 2025.pdf
PDF icon Revised Referral Supporting Document (RSD) Revision 9, December 2025.pdf
PDF icon Proposal Content Document_ 2025-12-05.pdf
PDF icon Appendix A - Stakeholder Consultation Register.pdf
PDF icon Appendix D - Havieron Infrastructure Corridor Reconnaissance Flora and Vegetation Survey, 2020.pdf
PDF icon Appendix H - Havieron Project Goodenia hartiana Targeted Flora Survey, 2024.pdf
PDF icon Appendix I - Goodenia hartiana map series.pdf
PDF icon Appendix K - Part 1 - Telfer Project Ecological Survey, 2002.pdf
PDF icon Appendix K - Part 2 - Telfer Project Power Supply and Infrastructure Corridor Rare and Priority Fauna and Flora Survey, 2003.pdf
PDF icon Appendix K - Part 3 - Vegetation Survey and Rare Flora and Fauna Search, Nifty Copper Operations, 2006.pdf
PDF icon Appendix K - Part 4 - Telfer Borefield Flora and Fauna Survey, 2007.pdf
PDF icon Appendix K - Part 5 - Telfer Goodenia hartiana Survey, 2010.pdf
PDF icon Appendix K - Part 6 - Telfer Optimisation Study Area Level 2 Flora and Fauna Survey, 2013.pdf
PDF icon Appendix K - Part 7 - Telfer O'Callaghan's Study Area Level 2 Flora and Fauna Survey, 2013.pdf
PDF icon Appendix Q - Havieron Project - Greater Bilby Monitoring 2022.pdf
PDF icon Appendix U - Havieron Project Social Studies - social risk assessment, 2021.pdf
Date published (Proponent response to submissions): 
January 5, 2026
Change to proposal during assessment under s. 43A
s. 43A notice: 
PDF icon S. 43A Notice - 251125.pdf
Date of approval s. 43A: 
Tue, 25/11/2025
4. EPA Report on assessment
EPA Report Number: 
1806
EPA Report: 
PDF icon EPA Report 1806 Telfer-Havieron Gold Mining Project.pdf
Key Environmental Factors: 
Greenhouse Gas Emissions
Social Surroundings
Flora and Vegetation
Subterranean Fauna
Terrestrial Fauna
Inland Waters
Date published: 
Wednesday, 8 April, 2026
Appeals close: 
Wednesday, 29 April, 2026

Source URL:https://www.epa.wa.gov.au/proposals/telfer-havieron-gold-mining-project