Dampier Seawater Desalination Plant (DSDP)

Project
Proponent: 
Hamersley Iron Pty Limited
Proposal description: 

The proponent (Hamersley Iron Pty Limited) proposes to build and develop a desalination plant at Parker Point, Dampier, located approximately 2.5km north-east of the Dampier township.  

This Proposal will establish a reliable potable water supply for the Proponent’s Dampier port operation  

(including Parker Point and East Intercourse Island), Dampier town and connection into Water  

Corporation’s West Pilbara Water Supply Scheme (WPWSS). The desalination plant may be delivered  

in stages up to a maximum production capacity of 8 GL/a of potable water to meet future water demands.

The Proposal would include: 

  • Seawater desalination plant  

  • Seawater intake  

  • Outfall to ocean  

  • Water transfer pipelines connecting the plant to potable water tanks and the existing West Pilbara Water Supply Scheme  

  • Other associated supporting infrastructure and services 

The proposal development envelope is 57.5 ha with most works occurring on previously disturbed land.  

  • 0.9 ha of the development envelope will occur within the Dampier Archipelago (including Burrup Peninsula) National Heritage Place (NHP) (0.002%). This intersect of the NHP occurs within the existing disturbed corridor that contains Water Corporation transfer pipelines.  

  • 13.5 ha of native vegetation will be cleared in the envelope (and 0.3 ha of this vegetation is within the NHP). 

The life of the proposal is projected to be 50 years.

Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
April 11, 2023
Current Status: 
Decision on whether to assess has been published
Decision on whether to assess has been published
1. Referral
Comment on this referral: 
Dampier Seawater Desalination Plant (DSDP)
Comment period: 
Monday, 17 October, 2022 to Sunday, 23 October, 2022
Referral documentation: 
PDF icon Referral form
PDF icon Supporting document
PDF icon Appendix A - DSDP OEMP_Rev0.pdf
PDF icon Appendix B - DSDP_CEMP_Rev0.pdf
PDF icon Appendix D - Memo_Engineering Design Detail.pdf
PDF icon Appendix F - Dilution Modelling Report_Rev 0.pdf
PDF icon Appendix G - Parker Point Power Station Pond Sediment Study.pdf
PDF icon Appendix H - Benthic Habitat Survey January 2021.pdf
PDF icon Appendix I - Parker Point Marine Assessment of Impacts.pdf
PDF icon Appendix J - Environmental Noise Impact Assessment.pdf
PDF icon Appendix K -JASCO Pile Drilling Technical Memo.pdf
PDF icon Appendix L -DSDP Flora_Veg_Fauna Report.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Referral examined, preliminary investigations and inquiries conducted. Proposal not to be assessed under Part IV of the EP Act. No advice given (Appealable)
Extract of determination: 
PDF icon Dampier Seawater Desalination Plant
Preliminary Environmental Factors: 
Social Surroundings
Marine Environmental Quality
Date published: 
Tuesday, 11 April, 2023