EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Yanchep Rail Extension: Part 1 – Butler to Eglinton

Yanchep Rail Extension: Part 1 – Butler to Eglinton

Project
Proponent: 
Public Transport Authority
Proposal description: 

The Public Transport Authority (PTA) proposes to extend the existing Joondalup railway line by 7.3 kilometres from Butler Station to the suburb of Eglinton in the City of Wanneroo. The proposal is to construct and operate the rail extension and includes two new intermodal (rail, bus, ‘park and ride’, ‘kiss and ride’, walk and cycle) transit stations at Alkimos and Eglinton.

The PTA will operate train services between Perth and Eglinton Stations and bus services from the Alkimos and Eglinton Stations.

The proposal will require the clearing and disturbance of 70.22 hectares, including 1.12 hectares of the Melaleuca huegelii – M. acerosa (M. systena) shrublands on limestone ridges Threatened Ecological Community 26a.

Proposal Content Document: 
PDF icon Proposal Content Document.pdf
Assessment Number: 
2157
Region: 
Perth
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
April 19, 2024
Current Status: 
Ministerial Statement published
Ministerial Statement published
1. Referral
Comment on this referral: 
Yanchep Rail Extension: Part 1 – Butler to Eglinton
Comment period: 
Friday, 16 February, 2018 to Thursday, 22 February, 2018
Referral documentation: 
PDF icon Referral Form.pdf
PDF icon Environmental Impact Assessment.pdf
PDF icon Appendix A - Flora and Fauna Report.pdf
PDF icon Appendix B - Dieback Assessment Part 1.pdf
PDF icon Appendix B - Dieback Assessment Part 2.pdf
PDF icon Appendix C - Geotechnical Report Part 1.pdf
PDF icon Appendix C - Geotechnical Report Part 2.pdf
PDF icon Appendix C - Geotechnical Report Part 3.pdf
PDF icon Appendix C - Geotechnical Report Part 4.pdf
PDF icon Appendix C - Geotechnical Report Part 5.pdf
PDF icon Appendix D -Aboriginal Consultation Survey.pdf
PDF icon Appendix D - Aboriginal Heritage Survey Addendum (Station Sites).pdf
PDF icon Appendix E - Noise and Vibration.pdf
PDF icon Appendix F - Bushfire Management Strategy.pdf
PDF icon Figures Part1.pdf
PDF icon Figures Part2.pdf
PDF icon Figures Part 3.pdf
PDF icon Figures Part 4.pdf
PDF icon Figures Part 5.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Additional Assessment Information (public review)
Extract of determination: 
PDF icon Yanchep Rail Extension: Part 1 – Butler to Eglinton
PDF icon CMS17314-Further Expanation of Decision-190318.pdf
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Subterranean Fauna
Terrestrial Environmental Quality
Terrestrial Fauna
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Monday, 19 March, 2018
3. Assessment
Request for further information
Date: 
Thursday, 22 March, 2018
File upload: 
PDF icon CMS17314 - Yanchep Rail Extension - Part 1 - Request for Further Information - 220318
Environmental Review
Public submissions: 
Monday, 17 December, 2018 to Friday, 18 January, 2019
Make a submission: 
Yanchep Rail Extension: Part 1 – Butler to Eglinton - Referral Information with Additional Information
Environmental Review documentation: 
PDF icon Environmental Review Document.pdf
PDF icon Appendix A - Biological Assessment.pdf
PDF icon Appendix B - Biological Factors Additional Information for the EPA.pdf
PDF icon Appendix C - Biological Factors Additional Information.pdf
PDF icon Appendix D - Phytophthora Dieback Occurrence Assessment.pdf
PDF icon Appendix E - Short Range Endemic Invertebrate Desktop Review and Risk Assessment.pdf
PDF icon Appendix F - Subterranean Fauna Desktop Review and Risk Assessment.pdf
PDF icon Appendix G - Hydrology Assessment.pdf
PDF icon Appendix H - Transportation Noise and Vibration Assessment.pdf
PDF icon Appendix I - Noise and Vibration Management Plan.pdf
PDF icon Appendix J - Aboriginal Heritage Survey.pdf
PDF icon Appendix K - Aboriginal Heritage Survey Addendum.pdf
PDF icon Appendix L - Preliminary Offsets Strategy.pdf
PDF icon Appendix M - Construction Environmental Management Plan.pdf
PDF icon Historical Information - 01 - Northern Suburbs Railway, Alkimos to Yanchep, Phytophthora cinnamomi occurrence assessment.pdf
PDF icon Historical Information - 02 - Northern Suburbs Railway Alignment Butler to Yanchep Environmental Investigation.pdf
PDF icon Historical Information - 03 - Report for Northern Suburbs Railway Alignment from Romeo Road (Alkimos) to Yanchep, Graceful Sun-moth Survey.pdf
PDF icon Historical Information - 04 - Desk-top Aboriginal Heritage Study of Proposed Northern Suburbs Railway Route.pdf
PDF icon Historical Information - 05 - Report on an Archaeological Survey of the Butler to Yanchep Railway Alignment.pdf
PDF icon Historical Information - 06 - Northern Suburbs Railway Extension Butler to Yanchep, Noise Assessment.pdf
PDF icon Historical Information - 07 - Northern Rail Extension Romeo Road to Yanchep, Ground Vibration Assessment.pdf
Date Published (Environmental Review documentation): 
December 17, 2018
Proponent response to submissions: 
PDF icon s43A Application
PDF icon Construction Environmental Management Plan.pdf
PDF icon Appendix A - Guideline for Batter Surface Stabilisation using vegetation.pdf
PDF icon Appendix B - Batter Stabilisation Technique Table.pdf
PDF icon Appendix C - Flora and Veg, Terrestrial Fauna and Landform Tables.pdf
PDF icon Appendix D - Biological Factors Report.pdf
PDF icon Appendix E - VTs by VC.pdf
PDF icon Appendix F - Targeted Survey.pdf
PDF icon Appendix G - Offsets Strategy.pdf
PDF icon Appendix I - Final Letter.pdf
PDF icon Appendix J - Yanchep Rail Desktop Fauna Report.pdf
PDF icon Appendix K - Yanchep Rail Underpass Study.PDF
PDF icon Appendix L - Hydrology Figure.pdf
PDF icon Appendix M - Emissions tables.pdf
PDF icon Appendix N - Black Cockatoo Habitat.pdf
PDF icon Attachment 1 - EPASU Comments.pdf
PDF icon Attachment 2 - PTA response to Public Comments.pdf
PDF icon Attachment 3 - Response to Quinns Rocks Environmental Group.pdf
PDF icon Attachment 4 - Reference List.pdf
PDF icon Attachment 5 - Appendix List.pdf
Date published (Proponent response to submissions): 
May 6, 2019
4. EPA Report on assessment
EPA Report Number: 
1634
EPA Report: 
PDF icon EPA Report 1634 - Yanchep Rail Extension: Part 1 - Butler to Eglinton
Key Environmental Factors: 
Social Surroundings
Flora and Vegetation
Landforms
Terrestrial Fauna
Date published: 
Monday, 6 May, 2019
Appeals close: 
Monday, 20 May, 2019
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Wednesday, 26 June, 2019
Ministerial Statement: 
PDF icon Ministerial Statement 1100.pdf
Post-assessment changes
s. 45C amendments: 

Attachment 1 to Statement 1100 - Change to the authorised extent in Schedule 1 Table 2 in Ministerial Statement 1100, including:
• Decrease in overall clearing and disturbance from 63.3 ha to 57.2 ha
• Decrease in native vegetation clearing from 37.72 ha to 32.3 ha
• Increase in clearing and disturbance of TEC Melaleuca huegelii – Melaleuca systena shrublands on limestone ridges (Gibson et al. 1994 type 26a) from 0.53 ha to 0.73 ha
• Updated Figures 1 to 4 to show changes to the development envelope
• Updated coordinates defining the Yanchep Rail Extension Part 1 – Butler to Eglington development envelope.

Change approved under S45c on 12 October 2020.

Attachment 2 to Statement 1100 - Increase the development envelope from 57.18 hectares (ha) to 60.69 ha. Decrease the authorised extent of native vegetation clearing from 32.3 ha to 31.64 ha. Decrease the authorised extent of Carnaby’s cockatoo habitat that can be cleared from 44.7 ha to 43.98 ha. Update Figures 1 to 4 to reflect the amendments to the development envelope. Updated coordinates defining the Yanchep Rail Extension Part 1 – Butler to Eglinton development envelope.Change approved under S45c on 19 April 2024.

Attachments: 
PDF icon Summary of Reasons.pdf
Date of approval s. 45C: 
Monday, 12 October, 2020
Friday, 19 April, 2024

Source URL:https://www.epa.wa.gov.au/proposals/yanchep-rail-extension-part-1-%E2%80%93-butler-eglinton