Eliwana Iron Ore Mine

Project
Proposal description

Fortescue Metals Group Ltd proposes to develop the Eliwana Mine Project in the Pilbara region of Western Australia. The Eliwana Mine Project Area is located approximately 90 km west-northwest of Tom Price.

Over the life of the mine, the average annual production rate is estimated at 30 Mtpa but infrastructure will be constructed to reflect peaks in the annual production rate up to 50 Mtpa. The estimated mine life is 24 years.

The proposal involves the clearing of up to 8,560 ha of native vegetation within the 70,000 ha Mine Development Envelope.

The Mine Development Envelope falls within the Ashburton River catchment and the Duck Creek sub-catchment. Mine dewatering will be required to accommodate below water table mining, requiring the abstraction of up to 12 GL/a of groundwater.

Assessment Number
2125
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
Referral documentation
2. Decision on whether to assess this proposal
3. Assessment
Scoping
Approved
Environmental Review
Environmental Review documentation
Date Published (Environmental Review documentation)
Date published (Proponent response to submissions)
Minor or preliminary work under s. 41A(3)
Change to proposal during assessment under s. 43A
4. EPA Report on assessment
EPA Report Number
1641
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Post-assessment changes
s. 45C amendments

Attachment 1 to Statement 1109 - Expand the approved Eliwana Mine Development Envelope by 2,496 ha to incorporate an additional two open cut iron ore pits (Penzance and La Manchapits), heavy haulage access and mining infrastructure to support mining of these pits above and below the water table. Direct clearing within the expanded development envelope is up to an additional 185 ha. Extend mining at the six existing approved pits in the Flying Fish area to below water table (mining in the Flying Fish area was limited to above water table mining in the original referral and EPA Report 1642), with no changes to the approval discharge extent of surplus water. Changes approved under s. 45C on 6 November 2023.

Date of approval s. 45C
Get notified of updates and new content