This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 9, 2024
The proposal is for the development of eco-friendly tourism accommodation including holiday units, a restaurant/function centre, and associated facilities, at Lot 660 La Perouse Court, Goode Beach. The proposed development envelope is 7.71 hectares (ha) and includes a 2.23 ha clearing footprint, a 0.402 ha wastewater reticulation zone, and a 5.02 ha conservation area. The proposal is located approximately 50m west of the Goode Beach foreshore and immediately east of Lake Vancouver, a... Read more...Last updated: April 26, 2024
FMG Iron Bridge (Aust) Pty Ltd proposes to extend existing operations at its North Star Magnetite Project , which is subject to Ministerial Statement 993 issued under Part IV of the, Environmental Protection Act 1986 ., The proposal is located approximately 110km southeast of Port Hedland in the Pilbara region of Western Australia. The proposed extension includes increasing the Mining Development Envelope by 1425.9 ha and total clearing by 606.9 ha to support new mine pits (180.7 ha); an... Read more...Last updated: April 24, 2024
The proposal is for the Stage 2 expansion of the Murrin Murrin Nickel-Cobalt mining and processing operation (Stage 1), 60 kilometres east of Leonora. The Stage 2 expansion includes the mining of additional ore; an expansion of the processing plant to process additional ore; and the development of additional infrastructure associated with mining and processing of the ore. Read more...Last updated: April 22, 2024
Chalice Mining Limited proposes development of the Gonneville Nickel-Copper-Platinum Group Element (PGE) Project. The proposal is located within the Wheatbelt Region, approximately 70km north-east of Perth, 25 km west of Toodyay and 25 km south-east of Bindoon. The proposal comprises of a mine site including an open mine pit and/or underground mine and infrastructure corridor options for water and power supply. Road and/or existing rail infrastructure will be utilised in transporting supplies... Read more...Last updated: April 22, 2024
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: April 22, 2024
Changes to conditions 3 and 6; of Ministerial Statement 1034 to extend the Time Limit of Authorisation for substantial commencement of the proposal (condition 3); and remove condition 6 prepare and submit a survey plan in relation to flora species Goodenia sp. aff. quasilibera. Changes to all conditions during the time extension and whether additional conditions for Aboriginal heritage and Greenhouse Gas Emissions should be required for this proposal. Read more...Last updated: April 19, 2024
The Public Transport Authority (PTA) proposes to extend the existing Joondalup railway line by 7.3 kilometres from Butler Station to the suburb of Eglinton in the City of Wanneroo. The proposal is to construct and operate the rail extension and includes two new intermodal (rail, bus, ‘park and ride’, ‘kiss and ride’, walk and cycle) transit stations at Alkimos and Eglinton. The PTA will operate train services between Perth and Eglinton Stations and bus services from the Alkimos and Eglinton... Read more...Last updated: April 17, 2024
The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...Last updated: April 16, 2024
The Waitsia Gas Project Stage 2 is a conventional gas proposal located approximately 16km East-South-East of the Dongara-Port Denison town sites. The proposal includes clearing of up to 17 ha of native vegetation to support the following: Construction and operation of a new gas processing plant with a maximum export capacity of 250 terajoules per day; Drilling of up to 6 new production wells to supplement the existing 2 wells; Installation of a gas gathering system comprising of flowlines and... Read more...Last updated: April 15, 2024
OZ Minerals Musgrave Operations Pty Ltd propose to develop the West Musgrave Copper and Nickel Project, located in the West Musgrave Ranges of Western Australia, approximately 1,300 km north-east of Perth near to the intersection of the borders between Western Australia, South Australia and the Northern Territory. The nearest towns include the Indigenous Communities of Jameson (Mantamaru) 26 km north, Blackstone (Papulankutja) 50 km east, and Warburton (Milyirrtjarra) 110 km west of the... Read more...Last updated: April 11, 2024
Tellus Holdings Ltd are proposing to increase the tonnage of waste accepted at the Sandy Ridge Facility from the current approved (Ministerial Statement 1078) 100,000 tonnes per annum to up to 280,000 tonnes per annum for permanent isolation in the Site’s waste disposal cells. The Proposal will occur within the existing and approved development envelope as outlined in Ministerial Statement 1078 Read more...Last updated: April 11, 2024
NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...Last updated: April 10, 2024
Simcoa Operations Pty Ltd is proposing to establish a new quartzite mine approximately 15 km north of Moora, in the Wheatbelt region of Western Australia, and 2 km north of the existing mine. The proposal will include the establishment of an above groundwater mine pit, waste rock landform, infrastructure corridor and associated infrastructure. Quartzite would be trucked to Simcoa’s existing smelter in the Kemerton Strategic Industrial Area 17 km north-east of Bunbury. It is anticipated the... Read more...Last updated: April 8, 2024
FI Joint Venture Pty Ltd is proposing to construct and operate a magnetite iron ore project, with mining, processing and associated infrastructure. The proposed mine is located approximately 225 kilometres (km) east-northeast of Geraldton and 15 km northeast of Yalgoo within the Shire of Yalgoo. The proposal includes a magnetite slurry pipeline and a water pipeline to Geraldton Port and a gas supply pipeline from the Dampier to Bunbury Natural Gas Pipeline network. Mining of the magnetite will... Read more...Last updated: April 2, 2024
Main Roads is proposing to upgrade and widen Anketell Road to an Expressway Standard for approximately 7.5 km between Leath Road and Kwinana Freeway in the City of Kwinana, WA. The Proposal will include grade separated interchanges at six locations, grade separation of road over rail at two locations and other supporting road infrastructure . Read more...Last updated: April 2, 2024
The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement in approved marine placement areas. Removal of the disused Kwinana Bulk Berth 1 (... Read more...Last updated: April 2, 2024
DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury. The KSIA key characteristics are: Development of the Kemerton Strategic industry Zone (Industry Core) which is approximately 2,024 hectares (ha). There is an approximate 50-year time period for development. Ultimate land use proposed is to be heavy... Read more...Last updated: March 28, 2024
South32 Worsley Alumina Pty Ltd currently operates the Boddington Bauxite Mine (located approximately 5km south-west of Boddington), Worsley Refinery (located approximately 15 km north-west of Collie) and port operations at the Bunbury Port. The new proposal is for the: · expansion of the existing mining area and incorporation of new mining areas; · development of a bauxite transport corridor; · development of a contingency mining area and maintenance work at the Refinery; and · development of... Read more...Last updated: March 26, 2024
Mt Weld Mining Pty Ltd proposes to expand the Mt Weld Mine, which includes the construction and operation of a rare earths mine and processing plant, to its life of mine extent. The expansion proposes to increase the development envelope from the currently approved 505 hectares (ha) to 2,802 ha, to allow for expansion of infrastructure and activities, including: a staged transition from diesel fuelled power generation to gas hybrid renewable (including solar and battery energy storage, and... Read more...Last updated: March 25, 2024
The Northern Terminal (NT) to Neerabup Terminal (NBT) 330kV Transmission Line proposal (the Proposal) is located approximately 13 km north of Perth in the City of Swan and City of Wanneroo. The Proposal is for the construction of a new 330kV dual circuit transmission line between NT in Malaga and NBT in Pinjar, a length of approximately 29 km. The purpose of the proposal is to reinforce the North Region transmission network to remove constraints on existing connected generation and provide... Read more...