Port of Port Hedland – Zone 5 Bypass Channel Project

Project
Proponent: 
Pilbara Port Authority
Proposal description: 

Pilbara Ports Authority are proposing for capital dredging of a bypass navigation channel to the east of Zone 5 of the existing shipping channel within the Port of Port Hedland. The proposal is a strategic marine risk-mitigation project intended to maintain vessel transit at an acceptable reduced capacity, should a grounding incident occur in Zone 5 of the channel.

Key construction elements of the Proposal include dredging of up to 800,000 m3 of seabed material within a total disturbance of 162 ha (63 ha being within WA State waters) and disposal of dredge material to an approved spoil ground located within Commonwealth (port) waters.

Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
May 11, 2026
Current Status: 
Decision on whether to assess has been published
Decision on whether to assess has been published
1. Referral
Comment on this referral: 
Port of Port Hedland – Zone 5 Bypass Channel Project
Comment period: 
Thursday, 23 April, 2026 to Thursday, 30 April, 2026
Referral documentation: 
PDF icon Port hedland Zone 5 Bypass Channel Referral Form_Redacted.pdf
PDF icon Port Hedland Zone 5 Bypass Channel Proposal Content Document.pdf
PDF icon Port Hedland Zone 5 Bypass Channel Environmental Review Document.pdf
PDF icon PHZ5BC Appendix 3 - Zone 5 Communications and Engagement Plan (Stakeholder Consultation Record).pdf
PDF icon PHZ5BC Appendix 4 - Zone 5 Bypass Channel Benthic Habitat Assessment.pdf
PDF icon PHZ5BC Appendix 5 - Modelling of Hydrodynamics, Waves and Dredging Spill.pdf
PDF icon PHZ5BC Appendix 6 - Sampling and Analysis Plan.pdf
PDF icon PHZ5BC Appendix 7 – SAP Implementation Report.pdf
PDF icon PHZ5BC Appendix 8 - Zone 5 Bypass Channel Marine Fauna Desktop Review.pdf
PDF icon PHZ5BC Appendix 9 – Cultural Heritage Desktop Assessment.pdf
PDF icon PHZ5BC Appendix 10 – Dredging Environmental Monitoring and Management Plan.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Referral examined, preliminary investigations and inquiries conducted. Proposal not to be assessed under Part IV of the EP Act. No advice given (Not Appealable)
Extract of determination: 
PDF icon APP-0035028_STAGE 2_Port of Pilbara Zone 5 Bypass Channel - Not Assess - Summary of reasons and public records.pdf
Preliminary Environmental Factors: 
Benthic Communities and Habitats
Marine Environmental Quality
Marine Fauna
Date published: 
Monday, 11 May, 2026

Source URL:https://www.epa.wa.gov.au/proposals/port-port-hedland-%E2%80%93-zone-5-bypass-channel-project