EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Nyidinghu Iron Ore Mine

Nyidinghu Iron Ore Mine

Project
Proponent: 
Chichester Metals Pty Ltd
Proposal description: 

Chichester Metals Pty Ltd, a subsidiary of Fortescue Metals Group, proposes to develop and operate an iron ore mine approximately 80 kilometres north-west of Newman. The Nyidinghu Iron Ore Mine proposal includes mine pits above and below the water table, an on-site ore processing from various sources, waste rock and tailings storage, an aerodrome, groundwater abstraction, surplus water management including aquifer recharge and other supporting infrastructure.  

The proposal has a development envelope of 92,301 hectare (ha) and a disturbance footprint of 12, 365 ha.  

Scope 1 greenhouse gas emissions are predicted to be up to 285,000 CO2 equivalence per annum (t CO2-e p/a during operations. 

Scope 2 greenhouse gas emissions are predicted to be up to 544,000 t CO2-e p/a during operations. 

The proposal excludes transport, electricity and water pipeline infrastructure required to connect the proposal to existing operations. This infrastructure is included in the East Hamersley Railway Project proposal.   

The East Hamersley Railway Project has also been referred to the Environmental Protection Authority and is being considered concurrently to this proposal. Further information on the East Hamersley Railway Project is available here.

Proposal Content Document: 
PDF icon Proposal Content Document - May 2025.pdf
Assessment Number: 
2376
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Industrial
Infrastructure
Last updated: 
May 5, 2025
Current Status: 
Environmental Scoping Document approved
Environmental Scoping Document approved
1. Referral
Comment on this referral: 
Nyidinghu Iron Ore Mine
Comment period: 
Monday, 21 August, 2023 to Sunday, 27 August, 2023
Referral documentation: 
PDF icon Referral form
PDF icon Proposal Content Document
PDF icon Supporting document
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon Nyidinghu Iron Ore Mine
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Landforms
Subterranean Fauna
Terrestrial Environmental Quality
Terrestrial Fauna
Inland Waters
Date published: 
Tuesday, 26 September, 2023
3. Assessment
Scoping
Environmental scoping document: 
PDF icon Final ESD - Approved 130224
Approved: 
Tuesday, 13 February, 2024
Change to proposal during assessment under s. 43A
s. 43A notice: 
PDF icon s.43A Notice - 050525.pdf
Date of approval s. 43A: 
Mon, 05/05/2025

Source URL:https://www.epa.wa.gov.au/proposals/nyidinghu-iron-ore-mine