EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Orebody 32 Below Water Table

Orebody 32 Below Water Table

Project
Proponent: 
BHP Iron Ore Pty Ltd
Proposal description: 

The proposal is a derived proposal to expand existing mining operations at the Newman Hub in the Pilbara, previously authorised by Ministerial Statement (MS) 1105 Pilbara Expansion Strategic Proposal.  

This proponent proposes to expand the existing Orebody 32 above water table iron ore mine (currently authorised by MS 1037 Eastern Ridge Revised Proposal) in BHP’s Newman Hub to below the water table.  

The proposal is located 3.6 km northeast of Newman, and includes activities permitted to be proposed under MS 1105 table 3, such as (but not limited to):  

  • groundwater abstraction,  

  • excavation of the existing mine pit below the water table,  

  • ground disturbance (vegetation and habitat removal up to 224 ha),  

  • associated and supporting infrastructure, utilising existing some existing infrastructure, 

  • surplus water discharge into Ophthalmia Dam through the development of a new pipeline, and  

  • rehabilitation and decommissioning.   

The proposal would have a maximum project life of 30 years and have the option for the formation of a pit lake in Orebody 32 upon decommissioning and rehabilitation.

Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Iron Ore
Last updated: 
September 8, 2023
Current Status: 
Decision on whether to assess has been published
Decision on whether to assess has been published
1. Referral
Comment on this referral: 
Orebody 32 Below Water Table
Comment period: 
Tuesday, 11 July, 2023 to Monday, 17 July, 2023
Referral documentation: 
PDF icon Referral form
PDF icon Supporting Document.pdf
PDF icon Appendix 01 - Proposal Content Document.pdf
PDF icon Appendix 03 - App3_1 Syrinx_Inputs to rehabilitation report.pdf
PDF icon Appendix 04 - IW_2 OB32E 2022 groundwater modelling update.pdf
PDF icon Appendix 04_1 OB32E Detailed Hydro Assessment_Optimized.pdf
PDF icon Appendix 04_OB32 BWT DP GW EIA__V0.pdf
PDF icon Appendix 05 - IW EMM_Water Balance model report.pdf
PDF icon Appendix 05_OB32 BWT DP Op Dam Surplus EIA_V0.1.pdf
PDF icon Appendix 06a ER PFAS LSI_Optimized.pdf
PDF icon Appendix 06b PFAS GW modelling.pdf
PDF icon Appendix 07 EPWRMP V6.2_Draft.pdf
PDF icon Appendix 08 OB32 BWT Water Management Plan _v1_Optimized.pdf
PDF icon Appendix 09 2022 Eastern Ridge MCP Rev 3.1 EXTERNAL PWD.pdf
PDF icon Appendix 10 - FV OB32SW Detailed Flora and Vegetation Assessment Spectrum 2022.pdf
PDF icon Appendix 11 - TF Stygofauna Monitoring Stantec 2022_Optimized.pdf
PDF icon Appendix 11 - TF Stygofauna toxicity assessment CRC Care 2022.pdf
PDF icon Appendix 12 - TF OB32SW MNES Vertebrate Fauna Survey Biota 2022.pdf
PDF icon Appendix 13 OB32 BWT IRP.pdf
PDF icon Appendix 16 - OB32 BWT - Stygofauna supplementary information.pdf
PDF icon Appendix 17 - OB32 BWT - Updated Greenhouse Gas Emissions Modelling.pdf
PDF icon Appendix 03_ 0220725_Rehab Report_FY2021_V0_OB32_Final_Optimized.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Declared derived proposal under s39B of the EP Act
Extract of determination: 
PDF icon Orebody 32 below water table
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Subterranean Fauna
Inland Waters
Statement of reasons: 
PDF icon Orebody 32 Statement of Reasons
Date published: 
Friday, 8 September, 2023

Source URL:https://www.epa.wa.gov.au/proposals/orebody-32-below-water-table