Mulga Downs Hub and Rail Spur

Project
Proponent: 
Roy Hill Infrastructure Pty Ltd
Proposal description: 

The Mulga Downs Hub and Rail Spur (the Proposal) is located approximately 210 km south of Port Hedland and 180 km northwest of Newman in the Pilbara region of Western Australia. The Proposal is for the development of a hub and rail spur to connect into the existing Roy Hill Railway for the transport of iron ore to Port Hedland.   

The Proposal includes truck unloading and train loading facilities, product rehandling facilities, stockyards, a laboratory, a rail loop and rail service tracks, lateral access roads, rail associated infrastructure including a rail spur line, passing loops, sidings, fibre optic cable, telecommunications towers, access tracks, borrow pits and laydown areas.  Additionally, the Proposal will contain bulk fuel storage and fuelling facility, energy supply infrastructure, ancillary buildings, wastewater treatment plant, accommodation village and an airstrip.  Included are access roads for haul, construction, and light vehicles. Construction and operations of water supply/bores and water storage will also be required.  

The Proposal is located within a Development Envelope no greater than 17,714.01 ha and will require clearing of no more than 2,304.74 ha of native vegetation.

Proposal Content Document: 
PDF icon MD Hub and Rail Spur Consolidated PCD s43A_December 2023.pdf
Assessment Number: 
2358
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
December 22, 2023
Current Status: 
Decision on whether to assess has been published
Decision on whether to assess has been published
1. Referral
Comment on this referral: 
Mulga Downs Hub and Rail Spur
Comment period: 
Wednesday, 18 January, 2023 to Tuesday, 24 January, 2023
Referral documentation: 
PDF icon Referral form
PDF icon Proposal content document
PDF icon Supporting document
PDF icon 1-Attexo 2022a Rail 8B red.pdf
PDF icon 1-Attexo 2022b Rail 1B red.pdf
PDF icon 1-Maia 2019-2022.pdf
PDF icon 1-Maia 2012 HPPL Mulga Downs Project.pdf
PDF icon 1-Strategen JBS_G 2022 Reconnaissance Flora.pdf
PDF icon 2-Attexo 2022c Option 8B red.pdf
PDF icon 2-Attexo 2022d Option 1B.pdf
PDF icon 2-Biologic 2022 red.pdf
PDF icon 2-Ecologia 2021a Pt 1.pdf
PDF icon 2-Ecologia 2021a Pt 2.pdf
PDF icon 2-Ecologia 2021b Mulga East PLN.pdf
PDF icon 2-Spectrum 2022 Eastern Portions of Alignments 8B _ 1B red.pdf
PDF icon 2-Spectrum 2022 HPPL Rail Spur.pdf
PDF icon 3-RMCA 54533 Rail IRF Hub Rail 20221201 Rev 0.pdf
PDF icon 4-RMCE 54533 MD HR CSFMP Rev 0.pdf
PDF icon 5-AQ2 2020a.pdf
PDF icon 5-AQ2 2020b.pdf
PDF icon 5-AQ2 2022 274c.pdf
PDF icon 5-Calibre 2022a.pdf
PDF icon 5-Calibre 2022b.pdf
PDF icon 5-Jurassic GW 2019.pdf
PDF icon 6-Mulga Downs - Rail VIA Rev 1.pdf
PDF icon HMCO_HPPL_00_1B8B_IBRAHighValues.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Additional Assessment Information (public review)
Extract of determination: 
PDF icon Mulga Downs Hub and Rail Spur
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Terrestrial Fauna
Inland Waters
Date published: 
Tuesday, 7 March, 2023
3. Assessment
Change to proposal during assessment under s. 43A
s. 43A notice: 
PDF icon Mulga Downs Hub and Rail Spur_s43a_Notice of approval.pdf
Date of approval s. 43A: 
Fri, 22/12/2023