Arrowsmith Hydrogen Project

Project
Proponent: 
Infinite Green Energy Limited
Proposal description: 

Infinite Green Energy propose to construct and operate a green energy wind and solar powered hydrogen production facility within freehold lots 3, 4, 100 and 6110 located in Arrowsmith 30km south of Dongara, within the Shire of Irwin, Western Australia (WA).

Infinite Blue Energy purchased the 1929.68 ha property due to the site’s abundance of wind and solar power combined with abundant quantity of quality fresh water.

The previous property use involved sheep, cattle and goats grazing.

The Infinite Green Energy proposal layout has been arranged to avoid wetlands, karst formations and Carnaby’s black cockatoo habitat on the property.

Manufacture of hydrogen requires a considerable electrical power resource and IGE plan to install a combination of wind turbines and solar array to provide green generated electricity to produce hydrogen.

The solar system proposal consists of 65 MW to 85 MW of solar panels to be constructed on 60 percent of the properties existing cleared land. Solar footprint total extent 139.85 ha.

The wind turbine proposal involves installing up to 25 turbine’s 6MW in size positioned strategically around the property to minimize impact.

The property contains 213.34 ha of previously disturbed vegetation.

The proposal disturbance footprint total is 242.28 ha.

The construction proposed vegetation clearing area is 139.31 ha.

Construction is planned to commence in quarter 1 2023 for production operations commencing in quarter 3 2025, subject to approvals and availability of equipment.

The scope of this referral includes the construction of the Arrowsmith Hydrogen Project including:

  • solar farm (minimum 65MW to maximum 85 MW)
  • wind turbines (22 minimum to 25 maximum x 6 MW)
  • water supply (groundwater)
  • processing plant output (max Extent 23 tpd up to 42 tpd)
  • storage and offloading

Once commissioned the plant will produce liquified compressed hydrogen utilising site ground water with final product transported via hydrogen fuelled road tankers to end users.

Assessment Number: 
2345
Region: 
Mid West
Referred under EP Act: 
s38
Industry sector: 
Power generation
Last updated: 
April 13, 2025
Current Status: 
Assessment on Proponent Information – public submission period closed
Assessment on Proponent Information – public submission period closed
1. Referral
Comment on this referral: 
Arrowsmith Hydrogen Project
Comment period: 
Tuesday, 21 June, 2022 to Monday, 27 June, 2022
Referral documentation: 
PDF icon Referral Form
PDF icon Proposal Content Document
PDF icon Supporting Document
PDF icon ARW-ENV-PLN-IBE-0001-Rev3 APH1 Construction EMP 17.06.2022.pdf
PDF icon ARW-ENV-PLN-IBE-0002-Rev3 AHP1 Weed and Die Back Management Plan 17.06.2022.pdf
PDF icon ARW-ENV-PLN-IBE-0003-Rev3 APH1 Vegetation Management Plan 17.06.2022.pdf
PDF icon ARW-ENV-PLN-IBE-0004-Rev3 AHP1 Fauna Management Plan 17.06.2022.pdf
PDF icon ARW-ENV-PLN-IBE-0005-Rev3 AHP1 Rehabilitation Plan 17.06.2022.pdf
PDF icon IBE_Arrowsmith_EPA_Survey_360Env_Preliminary_Report_Visual_Impact_ Assessment.pdf
PDF icon IBE_Arrowsmith_EPA_Survey_Bamford_Black_Cockatoo.pdf
PDF icon IBE_Arrowsmith_EPA_Survey_Bennelongia Subterranean Fauna Assessment.pdf
PDF icon IBE_Arrowsmith_EPA_Survey_Bennelongia_Species.pdf
PDF icon IBE_Arrowsmith_EPA_Survey_Cardno_Groundwater_Extraction_Scenarios.pdf
PDF icon IBE_Arrowsmith_EPA_Survey_Cardno_Surface_Water_Assessment.pdf
PDF icon IBE_Arrowsmith_EPA_Survey_Cardo_Hydrogeological_Investigation.pdf
PDF icon IBE_Arrowsmith_EPA_Survey_DNV_Wind_Farm_EMI_Assessment.pdf
PDF icon IBE_Arrowsmith_EPA_Survey_Ecoscpae_Environmental Survey.pdf
PDF icon IBE_Arrowsmith_EPA_Survey_Glevan_Dieback_Risk_Assessment.pdf
PDF icon IBE_Arrowsmith_EPA_Survey_Herring_Storer_Wind_Farm_Noise_Impact_Assessment.pdf
PDF icon IBE_Arrowsmith_EPA_Survey_Herring_Storer_WindFarm_Background_Noise_Monitorig.pdf
PDF icon IBE_Arrowsmith_EPA_Survey_Sticks_Stones_YSRC_Heritage.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Additional Assessment Information (public review)
Extract of determination: 
PDF icon Arrowsmith Hydrogen Project
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Terrestrial Fauna
Inland Waters
Date published: 
Monday, 18 July, 2022
3. Assessment
Request for further information
Date: 
Monday, 8 August, 2022
File upload: 
PDF icon 2345 - Notice under s. 40(2)(a) - Further information required for assessment - Arrowsmith Hydrogen Project (1).pdf
Environmental Review
Public submissions: 
Monday, 24 March, 2025 to Saturday, 12 April, 2025
Make a submission: 
Arrowsmith Hydrogen Project - Additional Information
Environmental Review documentation: 
PDF icon Supporting Document.pdf
PDF icon EPA_DOC_Index.pdf
PDF icon Appendix 1 EPA_9415_Speleological Consultation_Rev_1.pdf
PDF icon Appendix 2 EPA_DOC_Noise_Study_33875-1-21074-03_2_Rev_1.pdf
PDF icon Appendix 3 Revision 2.pdf
PDF icon Appendix 4 EPA_9417 WASG Endorsement Letter_Rev_1.pdf
PDF icon Appendix 5 EPA_DBCA Consultation_Rev_1.pdf
PDF icon Appendix 6 EPA_Heritage_9412 YSRC_Rev_1.pdf
PDF icon Appendix 7 EPA_Z01-ENV-SUR-IGE-0001-0_IGE Avifauna and Bat_Rev_1.pdf
PDF icon Appendix 8 EPA_Ecoscape_Detailed Flora and Veg Survey_Rev_1.pdf
PDF icon Appendix 9 EPA_9419 IGE Social Surrounds Consultation_Rev_1.pdf
PDF icon Appendix 10 EPA_9424 WASG Arrowsmith Karst Investigation_Rev_1.pdf
PDF icon Appendix 11 EPA_Environmental_Review_Framework_EMRF_Rev_1.pdf
Date Published (Environmental Review documentation): 
March 24, 2025
Change to proposal during assessment under s. 43A
s. 43A notice: 
PDF icon s. 43A Notice - 290125.pdf
PDF icon s. 43A Notice - 170225.pdf
Date of approval s. 43A: 
Mon, 17/02/2025