EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Yanchep Rail Extension: Part 2 – Eglinton to Yanchep

Yanchep Rail Extension: Part 2 – Eglinton to Yanchep

Project
Proponent: 
Public Transport Authority
Proposal description: 

The Public Transport Authority (PTA) proposes to construct and operate an extension of the existing Joondalup railway line from a point north of the proposed future Eglinton Station. The proposal will extend the Joondalup railway line through to Yanchep in the City of Wanneroo and includes a new intermodal transit station within the Yanchep City Centre area.

The development envelope is up to 73 hectares (ha) and the proposal will result in potential impacts to native vegetation that includes black cockatoo habitat; potential western quoll habitat; a Threatened Ecological Community (Melaleuca huegelii – M. acerosa (M. systena) shrublands on limestone ridges); and a number of Priority Ecological Communities including the Banksia dominated woodlands of the Swan Coastal Plain IBRA Region,  the Northern Spearwood shrublands, and the Tuart woodlands of the Swan Coastal Plain.

The proposal traverses Ningana Bushland (Bush Forever site 289) which contains regionally significant bushland.  The proposal may also impact four Priority listed flora species.

Note:  The EPA is currently assessing Part 1 of the Yanchep Rail Extension which is to construct and operate the rail extension from the existing Butler Station and includes two new intermodal transit stations at Alkimos and Eglinton.

Proposal Content Document: 
PDF icon Revised Proposal Content Document.pdf
Assessment Number: 
2174
Region: 
Perth
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
December 15, 2023
Current Status: 
Ministerial Statement published
Ministerial Statement published
1. Referral
Comment on this referral: 
Yanchep Rail Extension: Part 2 – Eglinton to Yanchep
Comment period: 
Tuesday, 4 September, 2018 to Monday, 10 September, 2018
Referral documentation: 
PDF icon Referral Form.pdf
PDF icon Envionmental Impact Assessment.pdf
PDF icon Appendix A - Flora and Fauna Report.pdf
PDF icon Appendix B - Part 2 Biological Factors Additional Information.pdf
PDF icon Appendix C - Dieback Assessment.pdf
PDF icon Appendix D - Geotechnical Report.pdf
PDF icon Appendix E - Short Range Endemics Desktop Review.pdf
PDF icon Appendix F - Subterranean Fauna Desktop Assessment.pdf
PDF icon Appendix G - Fauna Underpass Railway Cross-section.pdf
PDF icon Appendix H - Hydrology Assessment.pdf
PDF icon Appendix I - (a) Geotech Aboriginal Consultation Survey alias.pdf
PDF icon Appendix I - (b) Aboriginal Heritage Survey Addendum (Station Sites).pdf
PDF icon Appendix J - Noise & Vibration Assessment.pdf
PDF icon Appendix K - Noise and Vibraton Management Plan.pdf
PDF icon Appendix L - Bushfire Management Strategy.pdf
PDF icon Figures A to D4.pdf
PDF icon Figures E to J-3.pdf
PDF icon Figures J-4 to N.pdf
PDF icon Figures O to X.pdf
PDF icon Figures Y1 to HH.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon Yanchep Rail Extension: Part 2 – Eglinton to Yanchep
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Landforms
Subterranean Fauna
Terrestrial Fauna
Inland Waters
Date published: 
Monday, 17 September, 2018
3. Assessment
Scoping
Environmental scoping document: 
PDF icon CMS17456 Yanchep Rail Extension Part 2- Eglinton to Yanchep-ESD-251018.pdf
Approved: 
Thursday, 25 October, 2018
Environmental Review
Public submissions: 
Monday, 27 May, 2019 to Monday, 8 July, 2019
Make a submission: 
Yanchep Rail Extension: Part 2 – Eglinton to Yanchep - Public Environmental Review
Environmental Review documentation: 
PDF icon Environmental Review Document
PDF icon AppA_Environmental Scoping Document.pdf
PDF icon AppB_Schedule 4_EPBC Regulations_v1.pdf
PDF icon AppC_Environmental Impact Assessment - YRE Part 2.pdf
PDF icon AppD_Yanchep Rail Extension Part 2 Biological Assessment.pdf
PDF icon AppE_Yanchep Rail Exntesion Part 2 Biological Factors - Context and Impact Assessment.pdf
PDF icon AppF_Yanchep Rail Extension Part 2 Fauna Desktop Study.pdf
PDF icon AppG_Yanchep Rail Extension Part 2 Fauna Underpass Statement.pdf
PDF icon AppH_Short Range Endemic Invertebrate Desktop Review and Risk Assessment.pdf
PDF icon AppI_Subterranean Fauna Desktop Review and Risk Assessment.pdf
PDF icon AppJ_METRONET - YRE Hydrology Assessment.pdf
PDF icon AppK_Transportation Noise and Vibration Assessment, METRONET - Yanchep Rail Extension.pdf
PDF icon AppL_Noise and Vibration Management Plan, METRONET - Yanchep Rail Extension.pdf
PDF icon AppM_Aboriginal Heritage Survey of Proposed Northern Suburbs Railway Extension Alignment.pdf
PDF icon AppN_Addendum to Report on the Aboriginal survey of the Nothern Suburbs Railway Extension Alignment.pdf
PDF icon AppO_Environmental (Bush Forever site 289) Candidate Offset Site Investigation, Yanchep Rail Extension.pdf
PDF icon AppP_Additional info req by DoEE for impact assessment_v1.pdf
PDF icon AppQ_YRE Part 2 CEMP v4.pdf
PDF icon AppR_Proposed for Fauna Crossing_YRE Part 2 Fauna Crossing Suitability Advice Memo.pdf
PDF icon AppS_Qualitative Air Qualirty Assessment_ YRE Part 2 Rev 5.pdf
PDF icon AppT_Carbon and Energy Assessement Report_YRE Part 2 _Rev1.pdf
PDF icon AppU_WA Offsets Template YRE Part 2.pdf
PDF icon AppV_Cwlth Offsets Calculator.pdf
Date Published (Environmental Review documentation): 
May 27, 2019
Proponent response to submissions: 
PDF icon Response to Submissions.pdf
PDF icon Attachment 1 - Revised TEC PEC Tables from the ERD.pdf
PDF icon Attachment 2 -Supporting Information - Alignment through Ningana Bushland.pdf
PDF icon Attachment 3 - Construction Environmental Management Plan.pdf
Date published (Proponent response to submissions): 
October 16, 2019
4. EPA Report on assessment
EPA Report Number: 
1656
EPA Report: 
PDF icon EPA Report 1656 - Yanchep Rail Extension Part 2.pdf
Key Environmental Factors: 
Social Surroundings
Flora and Vegetation
Terrestrial Fauna
Date published: 
Monday, 25 November, 2019
Appeals close: 
Monday, 9 December, 2019
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Tuesday, 14 April, 2020
Ministerial Statement: 
PDF icon Statement 1129.pdf
Post-assessment changes
s. 45C amendments: 

Attachment 1 to Statement 1129 - Increase in the development envelope of 1.3 ha. Increase in the extent of clearing of native vegetation of 3.3 ha. Change to proposal approved under s45C 4 November 2020.

Attachment 2 to Statement 1129 - Increase the development envelope by 5.69 ha. Increase the extent of clearing of native vegetation by 1.21 ha Change to proposal approved under s45C 15 December 2023.

Attachments: 
PDF icon MS 1129 Summary of reasons s. 45C.pdf
Date of approval s. 45C: 
Wednesday, 4 November, 2020
Friday, 15 December, 2023

Source URL:https://www.epa.wa.gov.au/proposals/yanchep-rail-extension-part-2-%E2%80%93-eglinton-yanchep