EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Eliwana Iron Ore Mine

Eliwana Iron Ore Mine

Project
Proponent: 
Fortescue Metals Group Ltd
Proposal description: 

Fortescue Metals Group Ltd proposes to develop the Eliwana Mine Project in the Pilbara region of Western Australia. The Eliwana Mine Project Area is located approximately 90 km west-northwest of Tom Price.

Over the life of the mine, the average annual production rate is estimated at 30 Mtpa but infrastructure will be constructed to reflect peaks in the annual production rate up to 50 Mtpa. The estimated mine life is 24 years.

The proposal involves the clearing of up to 8,560 ha of native vegetation within the 70,000 ha Mine Development Envelope.

The Mine Development Envelope falls within the Ashburton River catchment and the Duck Creek sub-catchment. Mine dewatering will be required to accommodate below water table mining, requiring the abstraction of up to 12 GL/a of groundwater.

Assessment Number: 
2125
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Iron Ore
Last updated: 
November 6, 2023
Current Status: 
Ministerial Statement published
Ministerial Statement published
1. Referral
Comment on this referral: 
Eliwana Iron Ore Mine
Comment period: 
Monday, 17 July, 2017 to Sunday, 23 July, 2017
Referral documentation: 
PDF icon Referral Form
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon Eliwana Iron Ore Mine Project
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Subterranean Fauna
Terrestrial Fauna
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Monday, 31 July, 2017
3. Assessment
Scoping
Environmental scoping document: 
PDF icon CMS17163-ESD-Eliwana Iron Ore Mine.pdf
Approved: 
Thursday, 21 December, 2017
Environmental Review
Public submissions: 
Monday, 1 October, 2018 to Monday, 29 October, 2018
Make a submission: 
Eliwana Iron Ore Mine - Public Environmental Review
Environmental Review documentation: 
PDF icon Eliwana Iron Ore Mine FINAL Environmental Review Document.pdf
PDF icon Appendix 1 Eliwana Iron Ore Mine Project - Final Approved ESD.pdf
PDF icon Appendix 2 Eliwana Mine Closure Plan EW-PL-EN-0001.pdf
PDF icon Appendix 3 Surface Water Impact Assessment Part 1.pdf
PDF icon Appendix 3 Surface Water Impact Assessment Part 2.pdf
PDF icon Appendix 3 Surface Water Impact Assessment Part 3.pdf
PDF icon Appendix 3 Surface Water Impact Assessment Part 4.pdf
PDF icon Appendix 3 Surface Water Impact Assessment Part 5.pdf
PDF icon Appendix 4 Hydrogeological Conceptual Model Golder 2017.pdf
PDF icon Appendix 5 Numerical Groundwater Model Golder 2017.pdf
PDF icon Appendix 6 Mine Dewatering and Water Supply Report Golder 2017.pdf
PDF icon Appendix 7 Eliwana Groundwater Impact Assessment Golder 2017.pdf
PDF icon Appendix 8 Eliwana Mine Proposal Discharge Assessment Water Technology 2017.pdf
PDF icon Appendix 9 Surface Water Management Plan 100-PL-EN-1015.pdf
PDF icon Appendix 10 Eliwana Surface Water Management Plan 100-PL-EN-1015_r0A.pdf
PDF icon Appendix 11 Groundwater Management Plan 100-PL-EN-1009.pdf
PDF icon Appendix 12 Eliwana Groundwater Management Plan 100-PL-EN-1009_r0A.pdf
PDF icon Appendix 13 Subsurface Materials Classification 750WH-5700-RP-HY-0007.pdf
PDF icon Appendix 14 Conceptual Site Model and Risk Assessment 750WH-5700-RP-HY-0008.pdf
PDF icon Appendix 15 Geochemistry Risk Assessment for Closure 750WH-5700-RP-HY-0009.pdf
PDF icon Appendix 16 Eliwana Consolidated Flora and Vegetation Survey Biota 2017.pdf
PDF icon Appendix 17 Vegetation Health Monitoring and Management Plan 100-PL-EN-1020.pdf
PDF icon Appendix 18 Consolidated Vertebrate Fauna Survey Ecoscape 2017.pdf
PDF icon Appendix 19 Short-range endemic invertebrate fauna consolidation Eliwana Mine and Rail Phoenix 2018.pdf
PDF icon Appendix 20 Conservation Significant Fauna Management Plan 100-PL-EN-0022.pdf
PDF icon Appendix 21 Eliwana Project Subterranean Fauna Assessment Biologic 2017.pdf
PDF icon Appendix 22 Ethnobotanical and Ethnozoological Values Ecoscape 2018.pdf
PDF icon Appendix 23 GHG Emissions and Energy Reporting Management Plan 100-PR-GH-0001.pdf
Date Published (Environmental Review documentation): 
October 1, 2018
Proponent response to submissions: 
PDF icon Proponent Response to Submissions
PDF icon Groundwater Management Plan
PDF icon Surface Water Management Plan
Date published (Proponent response to submissions): 
March 27, 2019
Minor or preliminary work under s. 41A(3)
s. 41A(3) notice: 
PDF icon Notice of decision to consent to minor and preliminary works - Eliwana Iron Ore Mine - Assessment no. 2125
PDF icon Statement of reasons - Eliwana Iron Ore Mine Project
Change to proposal during assessment under s. 43A
s. 43A notice: 
PDF icon CMS17163 - S43A - Notice of decision - September 2018.pdf
PDF icon CMS17163 - S43A - Notice of decision - April 2018.pdf
Date of approval s. 43A: 
Fri, 07/09/2018
4. EPA Report on assessment
EPA Report Number: 
1641
EPA Report: 
PDF icon EPA Report - Eliwana Iron Ore Mine.pdf
Key Environmental Factors: 
Social Surroundings
Flora and Vegetation
Subterranean Fauna
Terrestrial Fauna
Inland Waters
Date published: 
Monday, 24 June, 2019
Appeals close: 
Monday, 8 July, 2019
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Wednesday, 14 August, 2019
Ministerial Statement: 
PDF icon Ministerial Statement 1109.pdf
Post-assessment changes
s. 45C amendments: 

Attachment 1 to Statement 1109 - Expand the approved Eliwana Mine Development Envelope by 2,496 ha to incorporate an additional two open cut iron ore pits (Penzance and La Manchapits), heavy haulage access and mining infrastructure to support mining of these pits above and below the water table. Direct clearing within the expanded development envelope is up to an additional 185 ha. Extend mining at the six existing approved pits in the Flying Fish area to below water table (mining in the Flying Fish area was limited to above water table mining in the original referral and EPA Report 1642), with no changes to the approval discharge extent of surplus water. Changes approved under s. 45C on 6 November 2023.

Date of approval s. 45C: 
Monday, 6 November, 2023

Source URL:https://www.epa.wa.gov.au/proposals/eliwana-iron-ore-mine