Project Proponent PIOP Mine Co NL Notice of Change of Proponent Notice of Change of Proponent.pdf (PDF, 164.79 KB) Proposal description The proposal is to develop and operate an iron ore mine on the Blacksmith tenement located approximately 70 km north-west of Tom Price in the Pilbara region of Western Australia. Assessment Number 1903 Region Pilbara Referred under EP Act s38 Industry sector Infrastructure Iron Ore Last updated January 11, 2013 Current Status Ministerial Statement published 1. Referral Referral documentation Referral Document.pdf (PDF, 7.45 MB) Attachment 1 Location Map.pdf (PDF, 309.93 KB) Blacksmith Flora and Vegetation Survey.pdf (PDF, 8.4 MB) Blacksmith Vertebrate Fauna and Short Range Endemic Survey.pdf (PDF, 5.17 MB) Delta Deposit Subterranean Fauna Survey.pdf (PDF, 1.96 MB) 2. Decision on whether to assess this proposal Chair's Determination Assess - Assessment on Proponent Information - Category A Extract of determination Chairman's Determination - Flinders Pilbara Iron Ore Project – Stage 1 (PDF, 60.66 KB) Preliminary Environmental Factors Flora and Vegetation Terrestrial Fauna Hydrological Processes Date published Monday, September 5, 2011 - 12:00 4. EPA Report on assessment EPA Report Number 1456 EPA Report EPA Report 1456 - Flinders Pilbara Iron Ore Project – Stage 1 (PDF, 7.34 MB) Proponent documents Environmental Review document - Flinders Pilbara Iron Ore Project – Stage 1 (PDF, 14.05 MB) Appendix 1-EPA Prepared Scoping Guideline (PDF, 245.03 KB) Appendix 2 - Applicable legislation (PDF, 24.98 KB) Appendix 3 - PIOP Groundwater Impact Assessment Report (PDF, 22.38 MB) Appendix 4 - Golders Groundwater Summary Report Area D (PDF, 5.8 MB) Appendix 5 - WP Geotechnical Desk Study (PDF, 718.51 KB) Appendix 6 - Golders_Desktop Geotechnical Assessment for prefeasibility study (PDF, 1.29 MB) Appendix 7 - Surface Hydrology for Delta Mine (PDF, 1.7 MB) Appendix 8 - Flora and Vegetation Survey (Ecoscape, 2011b) (PDF, 13.32 MB) Appendix 9 - Groundwater Dependent Ecosystem Mapping (PDF, 5.56 MB) Appendix 10 - Vertebrate Fauna and Short Range Endenic Survey (PDF, 6.16 MB) Appendix 11 - Delta Deposit Subterranean Fauna Survey (PDF, 5.81 MB) Appendix 12 - Addendum - Subterranean Fauna Survey (PDF, 9 MB) Appendix 13 - Indigenous Heritage Affairs Aboriginal Heritage (PDF, 214.62 KB) Appendix 14 - Significant Fauna Species Management Plan (PDF, 2.84 MB) Appendix 15 - Geochemical Characterisation of Mine Waste and Tailings (PDF, 6.8 MB) Appendix 15 - App A A-GCA waste rock (PDF, 4.54 MB) Appendix 15 App B-GCA tailings (PDF, 1.48 MB) Appendix 15 App C x-sections - Ajax L8 (PDF, 40.99 KB) Appendix 15 App C x-sections - Badger L2 (PDF, 90.61 KB) Appendix 15 App C x-sections - Blackjack L2 (PDF, 43.86 KB) Appendix 15 App C x-sections - Champion L8 (PDF, 88.89 KB) Appendix 15 App C x-sections - Champion L11 (PDF, 91.42 KB) Appendix 15 App C x-sections - Champion L19 (PDF, 92.52 KB) Appendix 15 App C x-sections - Champion SE L4 (PDF, 84.65 KB) Appendix 15 App C x-sections - Delta L6 (PDF, 103.12 KB) Appendix 15 App C x-sections - Delta L12 (PDF, 102.29 KB) Appendix 15 App C x-sections - Delta L24 (PDF, 101.9 KB) Appendix 15 App C x-sections - Eagle L1 (PDF, 71.34 KB) Appendix 15 App C x-sections - Eagle L520 (PDF, 71.34 KB) Appendix 15 App C x-sections - Eagle L9525 (PDF, 71.18 KB) Appendix 16 - Ajax Blackjack and Badger Groundwater Impact Assessment (PDF, 2.71 MB) Appendix 17 - Environmental Offsets Reporting Form (PDF, 68.63 KB) Appendix 18 - FMS Environmental Policy (PDF, 10.6 KB) Appendix 19 - Revision change tables (ZIP, 280.15 KB) Key Environmental Factors Flora and Vegetation Hydrological Processes Date published Wednesday, November 21, 2012 - 12:00 Appeals close Wednesday, December 5, 2012 - 12:00 5. Decision on proposal and implementation of proposal Ministerial Statement Date of approval Friday, January 11, 2013 - 12:00 Ministerial Statement Statement 924 - Flinders Pilbara Iron Ore Project – Stage 1 (PDF, 3.24 MB) Post-assessment changes Section 46 inquiry Flinders Pilbara Iron Ore Project – Stage 1 (s46)