Clay Excavations Lots 10, 11 and Pt Lot 36 Great Northern Highway, Upper Swan; Lots 23 and 51 Apple Street, Upper Swan; and Lots 40 and 41 previously Lots 21 and 22 Apple Street, Upper Swan (s46)
Newcrest Mining Limited, Telfer Project, Power Supply and Infrastructure Corridor, Port Hedland to Telfer Gold Mine, Great Sandy Desert (s46)