Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Land use (7) Apply Land use filter
  • Infrastructure (6) Apply Infrastructure filter
  • Industrial (4) Apply Industrial filter
  • Mineral sands (2) Apply Mineral sands filter
  • Power generation (2) Apply Power generation filter
  • Sand, rock, gravel and clay (2) Apply Sand, rock, gravel and clay filter
  • Utilities (2) Apply Utilities filter
  • Clearing (1) Apply Clearing filter
  • Coal (1) Apply Coal filter
  • Waste management (1) Apply Waste management filter

Filter by current status:

  • (-) Remove Ministerial Statement published filter Ministerial Statement published

Filter by preliminary environmental factors:

  • (-) Remove Social Surroundings filter Social Surroundings
  • Flora and Vegetation (18) Apply Flora and Vegetation filter
  • Terrestrial Fauna (14) Apply Terrestrial Fauna filter
  • 37 (12) Apply 37 filter
  • Inland Waters Environmental Quality (12) Apply Inland Waters Environmental Quality filter
  • Hydrological Processes (9) Apply Hydrological Processes filter
  • Terrestrial Environmental Quality (7) Apply Terrestrial Environmental Quality filter
  • Inland Waters (5) Apply Inland Waters filter
  • Marine Environmental Quality (4) Apply Marine Environmental Quality filter
  • Human Health (2) Apply Human Health filter
  • Marine Fauna (2) Apply Marine Fauna filter
  • People (2) Apply People filter
  • 3144 (1) Apply 3144 filter
  • Benthic Communities and Habitats (1) Apply Benthic Communities and Habitats filter
  • Coastal Processes (1) Apply Coastal Processes filter

Filter by Proponent:

  • City of Busselton (3) Apply City of Busselton filter
  • Cable Sands (WA) Pty Ltd (2) Apply Cable Sands (WA) Pty Ltd filter
  • Main Roads WA (2) Apply Main Roads WA filter
  • Shire of Busselton (2) Apply Shire of Busselton filter
  • Water Corporation (2) Apply Water Corporation filter
  • Albemarle Lithium Pty Ltd (1) Apply Albemarle Lithium Pty Ltd filter
  • Canal Rocks Pty Ltd (1) Apply Canal Rocks Pty Ltd filter
  • Cleanaway Solid Waste Pty Ltd (1) Apply Cleanaway Solid Waste Pty Ltd filter
  • Conservation and Parks Commission (1) Apply Conservation and Parks Commission filter
  • Conservation Commission of Western Australia (1) Apply Conservation Commission of Western Australia filter
  • Doral Mineral Sands Pty Ltd (1) Apply Doral Mineral Sands Pty Ltd filter
  • Griffin Power 3 Pty Ltd (1) Apply Griffin Power 3 Pty Ltd filter
  • Griffin Power Pty Ltd (1) Apply Griffin Power Pty Ltd filter
  • Lanco Resources Australia Pty Ltd (1) Apply Lanco Resources Australia Pty Ltd filter
  • Landcorp; South West Development Commission (1) Apply Landcorp; South West Development Commission filter
  • McDougall Quarries Pty Ltd (1) Apply McDougall Quarries Pty Ltd filter
  • Shire of Manjimup (1) Apply Shire of Manjimup filter
  • Simcoa Operations Pty Ltd (1) Apply Simcoa Operations Pty Ltd filter
  • Southern Ports Authority (1) Apply Southern Ports Authority filter
  • The Griffin Coal Mining Company Pty Limited (1) Apply The Griffin Coal Mining Company Pty Limited filter
  • Western Australia Biomass Pty Ltd (1) Apply Western Australia Biomass Pty Ltd filter
  • Worsley Alumina Pty Ltd (1) Apply Worsley Alumina Pty Ltd filter

Filter by region:

  • (-) Remove South West filter South West

Filter by last updated:

  • 2025 (1) Apply 2025 filter
  • 2024 (1) Apply 2024 filter
  • 2023 (4) Apply 2023 filter
  • 2022 (1) Apply 2022 filter
  • 2021 (2) Apply 2021 filter
  • 2019 (1) Apply 2019 filter
  • 2018 (1) Apply 2018 filter
  • 2016 (1) Apply 2016 filter
  • 2015 (1) Apply 2015 filter
  • 2014 (2) Apply 2014 filter
  • 2013 (1) Apply 2013 filter
  • 2012 (1) Apply 2012 filter
  • 2011 (3) Apply 2011 filter
  • 2010 (2) Apply 2010 filter
  • 2009 (1) Apply 2009 filter
  • 2003 (2) Apply 2003 filter
  • 1997 (1) Apply 1997 filter
  • 1996 (1) Apply 1996 filter
  • 1995 (1) Apply 1995 filter
  1. Home
  2. Proposal search
  3. Social Surroundings
  4. South West
  5. Ministerial Statement published

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Turkey Point Access Road and Bridge

Last updated: March 17, 2025

The Proposal is to develop a new bridge with a single lane dual carriage road and dual use path over the Preston River, to Turkey Point, Bunbury, Western Australia. The Proposal requires a disturbance footprint of 9.59 ha within the overall Proposal Development Envelope (DE) of 11.34 ha. Subtropical Temperate Coastal Saltmarsh Threatened Ecological Community (VT03 and VT04) is present within the Proposal DE and will require clearing of approximately 1.36 ha. 1.22 ha has been identified as... Read more...

Albemarle Kemerton Plant

Last updated: November 25, 2024

Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...

Forest Management Plan 2024-2033

Last updated: November 30, 2023

The Forest Management Plan 2024-2033 (FMP 2024-2033) is a statutory plan for the management of approximately 2,522,000 hectares of land and waters vested in the Conservation and Parks Commission in the south-west of Western Australia, in accordance with the, Conservation and Land Management Act 1984, (CALM Act) to fulfil the statutory purposes for which that land is reserved. The proposal is to undertake a range of management activities, the most significant being conservation reserve creation... Read more...

Banksia Road Landfill, Dardanup. Construction and Operation of Landfill Cells 9, 10 and 12A

Last updated: November 21, 2023

The Banksia Road Landfill is located in the Shire of Dardanup approximately 10 kilometres (km) from the City of Bunbury and 3.8 km south-east of the town of Dardanup. The Landfill is currently operating under a Licence issued through Part V of the Environmental Protection Act (Licence - L8904/2015/1) which allows for the acceptance of Liquid Waste; and Class II and Class III putrescible waste. The proposal would be a continuation of the current operations and including the establishment of... Read more...

Bunbury Outer Ring Road (Northern and Central Sections)

Last updated: May 10, 2023

The Commissioner of Main Roads Western Australia is proposing to construct and operate the northern section and upgrade the central section of the Bunbury Outer Ring Road (BORR). The proposal includes 19km of freeway-standard dual carriageway and associated interchanges between Forrest Highway and Boyanup-Picton Road (northern section) and between Boyanup-Picton Road and South West Highway (central section). The proposal would require the clearing of up to 73 hectares of native vegetation and... Read more...

Bunbury Outer Ring Road (Southern Section)

Last updated: February 15, 2023

Main Roads Western Australia is proposing to construct and operate the southern section of the Bunbury Outer Ring Road (BORR). The proposal includes 10.5 km of freeway-standard dual carriageway, 3 km of rural distributor roads and other associated road-infrastructure. The BORR southern section will connect to the proposed northern and central sections of BORR near South West Highway, which together will complete a bypass around Bunbury City from Forest Highway to Bussell Highway. The BORR... Read more...

Southern Extension of Sandpit, Lot 2 Calinup Road, Gelorup, Shire of Capel

Last updated: January 31, 2022

APH Contractors proposes to extract approximately 2.2 million bank cubic metres of sand from 22.87 hectares over a period of 20 years at an annual extraction rate of 100,000 – 120,000 tonnes per year. Sand will be extracted to a maximum depth of 20m Australian Height Datum (AHD). It is proposed that sand extraction will continue from east of Gelorup Hill and move progressively southwards in 18 sand extraction blocks, each between one and two hectares. Embankments will be restored to 1:4 (14o)... Read more...

Silicon Project, Kemerton and Mine at Moora - Revised Proposal

Last updated: August 9, 2021

The original proposal is for mining of silica (quartzite) rock approximately 15 kilometres north of Moora on Mining Lease M70/191, and smelting to produce silicon, employing wood, charcoal, coal and the silica mined at Moora, in the Kemerton Industrial Area approximately 20 kilometres north of Bunbury in the Shire of Harvey. This revised proposal is for an increase from the approved three submerged electric arc furnaces to four submerged electric arc furnaces at the Kemerton site, and the... Read more...

Yalyalup Mineral Sands Project

Last updated: May 17, 2021

Doral Mineral Sands Pty Ltd is proposing to develop and operate a mineral sands deposit approximately 11 kilometres southeast of Busselton. The proposal includes the development of mine pits and associated infrastructure, wet concentration processing plant, solar evaporation ponds, groundwater abstraction and water management infrastructure and process water pond. The proposal would include a total disturbance of 453.34 hectares within a development envelope of 924.8 hectares. The majority of... Read more...

Busselton Margaret River Regional Airport Expansion

Last updated: January 7, 2019

The City of Busselton currently operates the Busselton Margaret River Regional Airport (situated on Vasse Highway, Busselton) that allows for general aviation and closed charter fly-in fly-out operations. The City of Busselton is proposing to extend, widen and strengthen the existing runway and associated infrastructure of the Busselton Margaret River Regional Airport. This is a revised proposal to the current environmental approval under Ministerial Statement No. 1009. As a part of this... Read more...

Bluewaters Power Station Phase II

Last updated: April 4, 2018

Griffin Power Pty Ltd, proposes to construct and operate a 200MW coal-fired power station known as the Bluewaters Power Station Phase II (Bluewaters II) adjacent to the proposed Bluewaters Power Station (Bluewaters I) on a site located approximately 4km north-east of Collie. It would be a subcritical coal-fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters II Power Station would supplement the Bluewaters I Power Station and supply electricity... Read more...

Busselton Regional Aerodrome (s46) [1876]

Last updated: December 15, 2016

The proposal is to operate a regional airport at the Four Mile Hill site. During the assessment of an expansion to the  Busselton Regional Aerodrome , the proposal was changed under s.43A of the, Environmental Protection Act 1986, to remove the runway extension, widening and strengthening component. The details of the existing runway are defined in Schedule 1 of Ministerial Statement 901 for this proposal and, as such, a section 45C change to Ministerial Statement 901 has been approved for the... Read more...

Busselton Regional Aerodrome (s. 46) [2008]

Last updated: July 7, 2015

Inquiry under section 46 to change condition 4-1 - Ministerial Statement 901. Read more...

Bunbury Berth 14A Expansion Project

Last updated: June 18, 2014

The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...

Wastewater Treatment Plant, Stage 1 at Chugg Street Walpole (s. 46)

Last updated: February 7, 2014

The proposal is to construct, commission, operate and maintain a 1,000 equivalent persons capacity wastewater treatment plant to serve the Walpole town site and its environs. Inquiry under s46 into a request to remove conditions - Ministerial Statement 493 . Read more...

Access Road to Nelson Location 7965 (Sandy Peak), Doggerup Road, Shire of Manjimup

Last updated: June 4, 2013

This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal by the Shire of Manjimup to construct, operate and maintain a 6.5 kilometre (km) long all-weather, year-round access track from Windy Harbour Road to Nelson Location 7965, located entirely within the Doggerup Road reserve. Read more...

Busselton Regional Aerodrome (s46) [1918]

Last updated: February 7, 2012

Inquiry under s46 in regard to amendment of conditions of Ministerial Statement 0399 Busselton Regional Aerodrome. Read more...

Gwindinup Mineral Sands Mine

Last updated: November 24, 2011

The proposal is for the construction and operation of a mineral sands mine at Gwindinup, approximately 25 kilometres south-south-east of Bunbury and between two and ten kilometres south of the town of Boyanup. Read more...

Busselton Regional Aerodrome (s. 46) [1913]

Last updated: November 16, 2011

Inquiry under s46 of the EP Act to replace condition 4-4 of Ministerial Statement 399 . Read more...

Bluewaters Power Station Expansion - Phase III and Phase IV

Last updated: January 20, 2011

The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same... Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.