Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Industrial filter Industrial
  • Infrastructure (3) Apply Infrastructure filter

Filter by current status:

  • Ministerial Statement published (4) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (1) Apply Decision on whether to assess has been published filter
  • Ministerial Statement withdrawn under s.47A (1) Apply Ministerial Statement withdrawn under s.47A filter

Filter by preliminary environmental factors:

  • (-) Remove Inland Waters Environmental Quality filter Inland Waters Environmental Quality
  • 37 (5) Apply 37 filter
  • Flora and Vegetation (5) Apply Flora and Vegetation filter
  • Terrestrial Fauna (5) Apply Terrestrial Fauna filter
  • Social Surroundings (4) Apply Social Surroundings filter
  • Hydrological Processes (3) Apply Hydrological Processes filter
  • Landforms (2) Apply Landforms filter
  • Marine Environmental Quality (2) Apply Marine Environmental Quality filter
  • Benthic Communities and Habitats (1) Apply Benthic Communities and Habitats filter
  • Marine Fauna (1) Apply Marine Fauna filter
  • People (1) Apply People filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter
  • Terrestrial Environmental Quality (1) Apply Terrestrial Environmental Quality filter

Filter by Proponent:

  • Australian Methanol Company Pty Ltd (1) Apply Australian Methanol Company Pty Ltd filter
  • Kalium Lakes Potash Pty Ltd (1) Apply Kalium Lakes Potash Pty Ltd filter
  • Methanex Corporation (1) Apply Methanex Corporation filter
  • Port Hedland Port Authority (1) Apply Port Hedland Port Authority filter
  • Syntroleum Sweetwater (1) Apply Syntroleum Sweetwater filter
  • Wesfarmers Chemicals Energy & Fertilisers Limited (1) Apply Wesfarmers Chemicals Energy & Fertilisers Limited filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara

Filter by last updated:

  • 2024 (1) Apply 2024 filter
  • 2019 (1) Apply 2019 filter
  • 2018 (1) Apply 2018 filter
  • 2002 (2) Apply 2002 filter
  • 2000 (1) Apply 2000 filter
  1. Home
  2. Proposal search
  3. Industrial
  4. Pilbara
  5. Inland Waters Environmental Quality

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Utah Point Berth Project (Stage B)

Last updated: September 27, 2024

The Utah Point Berth Project consists of two separate stages: Stage A: Dredging and Reclamation; and Stage B: Construction and Operation. Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed. The EPA determined that Stage B, the construction and ongoing operation of stockyard... Read more...

Beyondie Sulphate of Potash Project

Last updated: June 7, 2019

Kalium Lakes Potash Pty Ltd is seeking to develop a sub-surface brine deposit to produce approximately 150 kilotonne per annum of Sulphate of Potash product and by-products. The process will involve evaporation and processing operations at the Beyondie, 10-Mile and Sunshine Lakes area. The Project is located approximately 160 kilometres south east of Newman, and 75 km east of the Kumarina Roadhouse, in the eastern Pilbara region of Western Australia. The proposal includes the development of... Read more...

Downstream Processing Chemical Production Facility

Last updated: December 3, 2018

Wesfarmers Chemicals, Energy & Fertilisers Limited  proposes  to construct and operate a methanol plant with a production capacity of approximately 5,000 tonnes per day ( tpd ) on Site E within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula.     The proposal is adjacent to the  Murujuga  National Park.      The proposal would  result in the  disturbance of  approximately  75 hectares within Site E.     Read more...

Methanol Complex, Burrup Peninsula

Last updated: December 20, 2002

Methanex proposes to develop a methanol complex on the Burrup Peninsula, approximately 1300 kilometres north of Perth. The selected project site is located in the King Bay – Hearson Cove Industrial Area, approximately 6 and 10 kilometres from the towns of Dampier and Karratha respectively. Approximately 84 hectares of the 100 hectare site will be cleared to accommodate the methanol complex. Read more...

Methanol Plant and Product Export, Burrup Peninsula

Last updated: December 20, 2002

The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...

Proposed Gas to Synthetic Hydrocarbons Plant, Burrup Peninsula

Last updated: September 18, 2000

Proposal to construct a gas to synthetics plant on the Burrup peninsula. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.