This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 17, 2010
The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...Last updated: May 23, 2003
The proposal is for the construction, operation, and maintainance of a natural gas fired combined cycle gas turbine (CCGT) power plant with a nominal generation capacity of 120 megawatts (MW) on a site located at Part Lot 131 Mason Road, on the southwestern corner of Donaldson Road and Burton Place, off Mason Road, Kwinana. The plant will provide approximately 1,045 gigawatt hours (GWhr) of electricity annually into the South West Interconnected System (SWIS) electricity market. Read more...