EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Cyclone Mineral Sands Project

Cyclone Mineral Sands Project

Project
Proponent: 
Lost Sands Pty Ltd
Proposal description: 

Lost Sands Pty Ltd (Lost Sands) proposes to develop and operate the Cyclone Mineral Sands Project, located on the northern margin of the Eucla Basin, approximately 317 kilometres (km) north of Eucla and 220 km north of the Trans-Australia Railway.

The proposal is for a mining operation to produce zircon and two high titanium mineral products. The conceptual layout of the mine includes open cut pits, mining and processing infrastructure, airstrip, camp and bore fields.

The proposal is located in the Great Victoria Desert bioregion. The bioregion is located to the north of the Nullarbor Plain and stretches from the southern rangelands of Western Australia across the border into the western half of South Australia. The proposal includes a haul road through the Great Victoria Desert Nature Reserve (GVDNR).

Assessment Number: 
1970
Region: 
Goldfields Esperance
Referred under EP Act: 
s38
Industry sector: 
Mineral sands
Last updated: 
January 9, 2017
Current Status: 
EPA Report and Recommendations released - appeals closed
Ministerial Statement published
1. Referral
Comment on this referral: 
Cyclone Mineral Sands Project
Comment period: 
Saturday, 9 March, 2013 to Friday, 15 March, 2013
Referral documentation: 
PDF icon Referral Document - Cyclone Mineral Sands Project
PDF icon Attachment 1 Project Location
PDF icon Attachment 3 Mine Infrastructure Layout
PDF icon Attachment 4 Vegetation and Flora Survey
PDF icon Attachment 8 Haul Road Options Study
PDF icon Attachment 9 Haul Road Fauna Survey
PDF icon Attachment 10 Fauna Report
PDF icon Attachment 12 Hydrogeology report
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon Chairman's Determination - Cyclone Mineral Sands Project
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Subterranean Fauna
Terrestrial Fauna
Hydrological Processes
Date published: 
Monday, 25 March, 2013
3. Assessment
Scoping
Environmental scoping document: 
PDF icon Environmental Scoping Document - Cyclone Mineral Sands Project
Approved: 
Wednesday, 21 August, 2013
Environmental Review
Public submissions: 
Monday, 29 June, 2015 to Monday, 3 August, 2015
Make a submission: 
Cyclone Mineral Sands Project
Environmental Review documentation: 
PDF icon Public Environmental Review - Cyclone Mineral Sands Project
Proponent response to submissions: 
PDF icon Response to Submissions - Cyclone Mineral Sands Project
4. EPA Report on assessment
EPA Report Number: 
1575
EPA Report: 
PDF icon Report 1575 - Cyclone Mineral Sands Project
Key Environmental Factors: 
Flora and Vegetation
Terrestrial Environmental Quality
Date published: 
Monday, 8 August, 2016
Appeals close: 
Monday, 29 August, 2016
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Monday, 9 January, 2017
Ministerial Statement: 
PDF icon Ministerial Statement 1052
Post-assessment changes
Section 46 inquiry: 
Cyclone Mineral Sands Project (S46) [2319]

Source URL:https://www.epa.wa.gov.au/proposals/cyclone-mineral-sands-project