EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Roe Highway Stage 7 Extension (South Street, Canning Vale to Kwinana Freeway, Leeming)

Roe Highway Stage 7 Extension (South Street, Canning Vale to Kwinana Freeway, Leeming)

Project
Proponent: 
Main Roads Western Australia
Proposal description: 

The proposal is to extend Roe Highway from South Street in Canning Vale to connect to Kwinana Freeway in Leeming over a distance of approximately 4.5 km. The highway is planned as a four-lane dual carriageway (two lanes in each direction), with provision for future upgrading to three lanes in each direction. The land required for any future upgrading will be provided in the median strip. The total footprint of the project area represents 62 hectares (ha).

Approximately 53.9 ha of this area will be cleared in two stages: i) Stage A – in the areas required for bridge construction at South Street, Karel Avenue and Kwinana Freeway, and for the section of highway between Karel Ave and Kwinana Freeway; and ii) Stage B – the remainder of the areas, following translocation of Caladenia huegelii individuals. The remaining 8.1 ha is existing degraded land.

Assessment Number: 
1466
Region: 
Perth
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
October 11, 2009
Current Status: 
Ministerial Statement published
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Terrestrial Environmental Quality
Terrestrial Fauna
Hydrological Processes
Date published: 
Monday, 27 January, 2003
3. Assessment
Scoping
Approved: 
Tuesday, 26 August, 2003
Environmental Review
Public submissions: 
Monday, 26 January, 2004 to Tuesday, 23 March, 2004
Environmental Review documentation: 
PDF icon PER document
PDF icon Appendix A - Draft Environmental Scoping Document
PDF icon Appendix B - Project Representative Group Meetings
PDF icon Appendix C - Vegetation studies
PDF icon Appendix D - Fauna studies
PDF icon Appendix E - Noise studies (Part 1)
PDF icon Appendix E - Noise studies (Part 2)
PDF icon Appendix F - Air quality studies
Proponent response to submissions: 
PDF icon Report on issues from submissions and response to issues
PDF icon Plan 1 - Offset and interchange Banksia conservation areas
PDF icon Roe Highway Stage 7 - Regional Air Quality Study
PDF icon Independent review of air quality impact assessment
PDF icon Independent review of noise impact assessments
PDF icon Roe 7 Design - Alignment
PDF icon Procedure for Environmental Mitigation Strategy
4. EPA Report on assessment
EPA Report Number: 
1138
EPA Report: 
PDF icon Roe Highway Stage 7 Extension (South Street in Canning Vale to Kwinana Freeway in Leeming)
Key Environmental Factors: 
Social Surroundings
Flora and Vegetation
Terrestrial Environmental Quality
Date published: 
Tuesday, 8 June, 2004
Appeals close: 
Tuesday, 22 June, 2004
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Monday, 18 October, 2004
Ministerial Statement: 
PDF icon Ministerial Statement 663
Post-assessment changes
s. 45C amendments: 

Attachment to Statement 663 - Change to broad-scale map (Figure 1) in Schedule 1, and more detailed descriptions in subsequent documentation - change to proposal under s45C approved on 22 September 2005.

Attachment to Statement 663 - Change to broad-scale map (Figure 1) in Schedule 1, and more detailed descriptions in subsequent documentation. Change to offset package - change to proposal under s45C approved on 11 October 2009.

Date of approval s. 45C: 
Thursday, 22 September, 2005
Sunday, 11 October, 2009

Source URL:https://www.epa.wa.gov.au/proposals/roe-highway-stage-7-extension-south-street-canning-vale-kwinana-freeway-leeming