Home > Printer-friendly > Printer-friendly > Expansion of Monkey Mia Dolphin Resort

Expansion of Monkey Mia Dolphin Resort

Project
Proponent: 
Monkey Mia Dolphin Resort Pty Ltd
Proposal description: 

The proposal is for the expansion of the Monkey Mia Dolphin Resort, incorporating both construction and operation. There are three primary components to the proposal:

  • increasing the capacity of the Resort from approximately 600 to 1200 guests per night through an increase from its current area of 3.74 hectares (ha) up to 6.84 ha;
  • developing a new staff accommodation precinct of 2.3 ha immediately to the west of the existing Resort area, incorporating accommodation, recreational facilities and car and boat/trailer parking areas; and
  • upgrading the site’s wastewater treatment plant (WWTP) using a membrane bioreactor package plant to a total maximum area of 0.36 ha.

The Resort is contained within Reserve 40727, also described as Lot 104 on Deposited Plan (DP) 28250. The expansion area and staff accommodation area are to be excised from the adjacent proposed Lot 105 on DP219786. The WWTP is within a portion of proposed Lot 103 on DP219786.

Assessment Number: 
1455
Region: 
Gascoyne
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
June 29, 2017
Current Status: 
Ministerial Statement published
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Preliminary Environmental Factors: 
Flora and Vegetation
Date published: 
Monday, 7 October, 2002
3. Assessment
Scoping
Environmental scoping document: 
PDF icon Monkey Mia Resort Expansion –Environmental Scoping Document
Approved: 
Friday, 5 March, 2004
Environmental Review
Public submissions: 
Tuesday, 8 June, 2004 to Tuesday, 6 July, 2004
Environmental Review documentation: 
PDF icon PER document
PDF icon Appendices to the PER
PDF icon PER Figures
4. EPA Report on assessment
EPA Report Number: 
1165
EPA Report: 
PDF icon Expansion of Monkey Mia Dolphin Resort
Key Environmental Factors: 
Marine Environmental Quality
Marine Fauna
Flora and Vegetation
Terrestrial Environmental Quality
Terrestrial Fauna
Date published: 
Monday, 21 February, 2005
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Wednesday, 28 December, 2005
Ministerial Statement: 
PDF icon Ministerial Statement 709
Post-assessment changes
Section 46 inquiry: 
Expansion of the Monkey Mia Dolphin Resort, Shark Bay (s46)
Expansion of the Monkey Mia Dolphin Resort [s46]
s. 45C amendments: 

Attachment 1 to Statement 709 - Increase the wastewater treatment plant area requiring an additional 2.9 hectares (ha) of vegetation clearing; development and use of temporary borrow pits requiring 3.14 ha of vegetation clearing, that will then be rehabilitated after construction; administrative changes to Schedule 1 of Ministerial Statement 709 to describe the proposal in terms of a ‘development envelope’, simplify the description of the resort expansion, and remove elements relating to the design of the resort that are not relevant to the environment - changes to proposal under s45C approved on 29 June 2017.

Date of approval s. 45C: 
Thursday, 29 June, 2017