EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Wyloo North Iron Ore Mine

Wyloo North Iron Ore Mine

Project
Proponent: 
Fortescue Ltd
Proposal description: 

Fortescue Ltd (Fortescue) proposes to develop the Wyloo North Iron Ore Mine in the Pilbara region of Western Australia, approximately 110 kilometres (km) west of Tom Price in the Hamersley Range.

The Proposal involves the construction and operation of an iron ore mine using conventional open-cut methods, including mining both above and below the groundwater table. To support mining activities, the Proposal includes the development of mine pits, waste rock landforms, ore and soil stockpiles, and supporting linear and ancillary infrastructure (including an infrastructure corridor and associated facilities). Groundwater abstraction and dewatering will be undertaken as required to enable below water table mining, supported by water management infrastructure within the project area.

Ore extracted from the Proposal area will be transported by road train to the Eliwana Iron Ore Mine, located approximately 3 km northeast, for processing.

The proponent estimates that up to 4,954.5 hectares (ha) of disturbance is required to support the proposed mining operations within a 21,910.1 ha Mine Development Envelope (MDE).

The operational life of the proposal is estimated to be approximately 13 years.

Proposal Content Document: 
PDF icon Wyloo_North_Final_Proposal_Content_Document.pdf
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Iron Ore
Last updated: 
March 4, 2026
Current Status: 
Decision on whether to assess has been published
Decision on whether to assess has been published
1. Referral
Comment on this referral: 
Wyloo North Iron Ore Mine
Comment period: 
Tuesday, 17 February, 2026 to Monday, 23 February, 2026
Referral documentation: 
PDF icon WylooNorthFloraVegetationSurvey2025.pdf
PDF icon WylooNorthSREFaunaSurvey2025.pdf
PDF icon WylooNorthTerrestrialFaunaSurvey2025.pdf
PDF icon Wyloo_North_EPA_ EPBC_Referral_Supporting_Document.pdf
PDF icon Wyloo_North_Final_Proposal_Content_Document.pdf
PDF icon WylooN_s38_Referral_Form_20260202_Signed.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon Wyloo North Iron Ore Mine
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Subterranean Fauna
Terrestrial Environmental Quality
Terrestrial Fauna
Inland Waters
Date published: 
Thursday, 5 March, 2026

Source URL:https://www.epa.wa.gov.au/proposals/wyloo-north-iron-ore-mine